I35NEXCentral

309 posts

I35NEXCentral banner
I35NEXCentral

I35NEXCentral

@I35NEXCentral

Official Twitter feed for construction updates & news for I-35 NEX Central Project. This account is managed by Alamo NEX Construction on behalf of TxDOT.

San Antonio, TX Katılım Mayıs 2021
116 Takip Edilen376 Takipçiler
I35NEXCentral
I35NEXCentral@I35NEXCentral·
📢Big Announcement! The I-35 NEX Central project is moving social media and lane closure information to @TxDOTSanAntonio For the latest updates on the I-35 NEX Central project and all other I-35 NEX projects, follow @TxDOTSanAntonio on X and @TxDOTSanAntonioTX on Facebook.
I35NEXCentral tweet media
English
1
0
3
1.2K
I35NEXCentral
I35NEXCentral@I35NEXCentral·
A full weekend closure of the westbound frontage road of Loop 1604 at Agora Parkway to the northbound frontage road of I-35 at the Forum Access Road is scheduled for Friday (8/16) at 9 pm until Monday (8/19) at 5 am for striping, barrier, and pavement work. Follow detour signs.
I35NEXCentral tweet media
English
0
0
1
958
I35NEXCentral
I35NEXCentral@I35NEXCentral·
School starts this week for NEISD, JISD, and SCUCISD. Get back in the habit of slowing down in school zones.
I35NEXCentral tweet media
English
0
0
0
734
I35NEXCentral
I35NEXCentral@I35NEXCentral·
A full weekend closure on the westbound frontage road of Loop 1604 at Agora Parkway to the northbound frontage road of I-35 at Forum Access Road is scheduled for Friday, 8/16, at 9 pm until Monday, 8/19, at 5 am for temporary pavement work. Traffic should follow detour signs.
I35NEXCentral tweet media
English
0
1
1
449
I35NEXCentral
I35NEXCentral@I35NEXCentral·
The full closure of Loop 1604 at I-35 has been rescheduled for Friday, August 23, 2024, to Monday, August 26, 2024. Please click the link below for details on next week's lane closures (weather permitting and subject to change): 8/04/2024 - 8/10/2024. conta.cc/46wOHGs
I35NEXCentral tweet media
English
0
1
6
3.2K
I35NEXCentral
I35NEXCentral@I35NEXCentral·
Please be advised. There is a crash on the northbound mainlanes of I-35 at Thousand Oaks Drive/Starlight Terrace. Expect delays.
I35NEXCentral tweet media
English
0
2
3
335
I35NEXCentral
I35NEXCentral@I35NEXCentral·
Due to weather, the full closure of Loop 1604 at I-35 has been rescheduled to Friday, August 2, 2024 to Monday, August 5, 2024. Please see below for details on next week's lane closures (weather permitting and subject to change): 7/28/2024 - 8/3/2026. conta.cc/3WFnr5s
I35NEXCentral tweet media
English
0
1
0
363
I35NEXCentral
I35NEXCentral@I35NEXCentral·
Due to weather, the full closure for this weekend has been rescheduled for Friday, August 2, 2024, at 9 p.m. Please see updated construction notice.
I35NEXCentral tweet media
English
0
1
3
437
I35NEXCentral
I35NEXCentral@I35NEXCentral·
Full weekend closure of all eastbound and westbound mainlanes and all ramps of Loop 1604 at I-35 scheduled from Friday (7/26) at 9 pm through Monday (7/29) at 5 am for installing steel girders. Traffic should follow detour signs. All mainlanes of I-35 will be open.
I35NEXCentral tweet media
English
0
4
10
7.1K
I35NEXCentral
I35NEXCentral@I35NEXCentral·
This is the dawn of eastbound elevated lanes of the I-35 NEX Central project near I-410 and Perrin Beitel. There will be roughly 65 columns from Perrin Beitel to the southbound lanes of I-35. That represents about 4% of the 1,500 total columns in the entire project.
I35NEXCentral tweet media
English
0
0
2
239
I35NEXCentral
I35NEXCentral@I35NEXCentral·
An I-35 NEX Central Project sneak peek, where bridge beams over 70 feet tall tower above Austin Highway on westbound I-410 towards Perrin Beitel. Once completed, this will be the view as you descend from the southbound elevated lanes of I-35 to the westbound mainlanes of I-410.
I35NEXCentral tweet media
English
0
0
7
504
I35NEXCentral
I35NEXCentral@I35NEXCentral·
The Share the Road: Look Twice for Motorcycles campaign reminds drivers to use safe driving habits, such as looking twice and using turn signals before changing lanes. Special attention should be paid at intersections, where more than a third of all motorcycle fatalities occur.
I35NEXCentral tweet media
English
0
1
3
208
I35NEXCentral
I35NEXCentral@I35NEXCentral·
The I-35 NEX Central project is expanding the I-35 southbound frontage road from Weidner Road to Thousand Oaks Drive. An extra lane has been added to the right, allowing the closure of the left lane to create more space for construction without reducing traffic capacity.
I35NEXCentral tweet media
English
0
0
6
258
I35NEXCentral
I35NEXCentral@I35NEXCentral·
You are looking north towards Loop 1604 from southbound I-35 at Judson Road. Nearly 50 bridge columns and caps are on the southbound frontage road from Pat Booker Road to Judson Road. 96% of those are complete. Lane closures for (7/7/24 - 7/13/24) conta.cc/3zFCBhJ
I35NEXCentral tweet media
English
0
0
2
271
I35NEXCentral
I35NEXCentral@I35NEXCentral·
Be safe as you travel the state's roads. In Texas, over the July 4th holiday in 2023, there were 57 fatal crashes, resulting in 64 fatalities. Here are a few tips to help keep you safe: Don't drink and drive, wear your seatbelt, eliminate distractions, and obey the speed limit.
I35NEXCentral tweet media
English
0
0
0
175
I35NEXCentral
I35NEXCentral@I35NEXCentral·
Please be advised there is a full nightly closure on southbound mainlanes of I-35 from Thousand Oaks Drive to Walzem Road scheduled for Monday, July 1, 2024, & Tuesday, July 2, 2024, from 8 p.m. to 6 a.m. for milling and overlay operation. Traffic should follow detour signs.
I35NEXCentral tweet media
English
0
0
1
202
I35NEXCentral
I35NEXCentral@I35NEXCentral·
A full 24/7 closure on westbound and eastbound mainlanes of Loop 1604 at I-35, full closure on westbound and eastbound collector ramps of Loop 1604 at I-35 for installing steel girders scheduled for Friday, 7/19 at 9 pm until Monday, 7/22, at 5 am.
I35NEXCentral tweet media
English
0
0
3
227
I35NEXCentral
I35NEXCentral@I35NEXCentral·
North of Olympia Parkway on northbound I-35, the open drainage channel on the northbound frontage road is being filled with 280 box culverts, to create a closed drainage channel. Once they are all in place, the culverts will be paved over to create the new Evans Road exit ramp.
I35NEXCentral tweet media
English
0
0
6
268
I35NEXCentral
I35NEXCentral@I35NEXCentral·
What are those projections sticking out from the sides of the bridge? They are more than guardrails. They are a part of the formwork system necessary to shape the concrete into the driving surface of the elevated lanes. Next week's lane closures: conta.cc/3XxM84o
I35NEXCentral tweet media
English
0
0
4
220
I35NEXCentral
I35NEXCentral@I35NEXCentral·
On the I-35 southbound frontage road near @IKEA, a construction team is removing the formwork from one of the last column caps in the area. Once bridge beams are set here later this summer, they will stretch south from McMorris Boulevard past the Shin Oak bridge.
I35NEXCentral tweet media
English
1
0
5
296