suraj // frame 🪽

10.2K posts

suraj // frame 🪽 banner
suraj // frame 🪽

suraj // frame 🪽

@heyinterframe

thirty stories, i think that im falling making music, coding things, hoping.

canada انضم Temmuz 2012
1.4K يتبع221 المتابعون
suraj // frame 🪽 أُعيد تغريده
Gil McGowan
Gil McGowan@gilmcgowan·
“God bless the Weston family,” says Ford, when asked to explain why he won’t introduce legislation to stop surveillance pricing, the latest scam being used to gouge consumers. There you have it folks: conservative politicians rule for billionaires, not ordinary working people.
Avi Lewis@avilewis

English
63
695
2.2K
46K
suraj // frame 🪽 أُعيد تغريده
Eric Lombardi (EricForOLP.ca) 🇨🇦🚀
Our model for transit investment, operations, and maintenance is frankly broken. There is almost no incremental reforms at Metrolinx that will work. Between UP, the ONxpress/RER fiasco, and the cost disease in every project we do, serious change is needed.
John Bowker@bowker_john

Metrolinx kept UP Express defects secret: “The missing & broken bolts were not caught by the private contractor paid by Metrolinx to maintain the line, a situation similar to what led to the Feb derailment of a GO train outside of Union Station” thestar.com/news/gta/confi… #onpoli

English
1
6
62
2.2K
suraj // frame 🪽 أُعيد تغريده
joyce #INDIER♡CK
joyce #INDIER♡CK@athrala·
top 3 album of the year holy shit dude this is perfect
joyce #INDIER♡CK tweet media
English
15
4
248
6.8K
suraj // frame 🪽 أُعيد تغريده
Andrea Dekeseredy
Andrea Dekeseredy@AndieWinnipeg·
Congratulations to the @NDP for getting multiple Canadian politicians on the record saying they support companies charging people different prices for the same product.
English
21
474
2.8K
24.8K
suraj // frame 🪽 أُعيد تغريده
deadAir
deadAir@deadAirrecords·
[ dA - 027 ] kuru - "Backstage hologram" out tonight via deadAir
deadAir tweet mediadeadAir tweet media
English
5
65
472
5.7K
kuru
kuru@kuru8k·
TONIGHT
English
25
310
2.1K
25K
suraj // frame 🪽
suraj // frame 🪽@heyinterframe·
@kuru8k can’t wait, the visuals for this album are so cool, love this sm
English
0
0
3
721
suraj // frame 🪽 أُعيد تغريده
Dosa
Dosa@chiefdosaa_·
kuru - Backstage Hologram (Album) | Midnight
Dosa tweet mediaDosa tweet media
English
21
71
1.1K
24.5K
suraj // frame 🪽 أُعيد تغريده
ini 𐙚
ini 𐙚@beruue·
when miis are too small they use a stool to reach things 😭😭😭
English
110
6.2K
83.5K
1.2M
suraj // frame 🪽 أُعيد تغريده
soul khan
soul khan@soulkhan·
oh fuck, im on the subway. damn i hate that i can just sit here and read or watch something. i really wish i was responsible for manually operating a more confined vehicle that is more likely to get me killed than this one
English
21
1.3K
18.6K
218.5K
suraj // frame 🪽 أُعيد تغريده
Steve Munro
Steve Munro@SwanBoatSteve·
I am really getting tired of @EnglishRail prattling on on @metromorning about eliminating streetcar stops as a way to speed service. This is a complete red herring. Yes there are a few closely spaced stops, but overall this is not going to fix basic problems with service quality.
English
7
3
40
6.4K
suraj // frame 🪽 أُعيد تغريده
salehdigital
salehdigital@saleh_digital·
sf mans: i FIRED 4 designers stop paying the design TAX designers are COOKED design is DEAD i remade figma in TWO NANOSECONDS toronto mans: design is a thoughtful intentional act of making something wonderful to build the world we want to live in
English
9
12
206
6.4K
suraj // frame 🪽 أُعيد تغريده
Wayne Cheung
Wayne Cheung@waynecheung29·
Problems with UP Express tracks dating back to 2015 defy repair attempts, confidential Metrolinx report reveals TL;DR or you can't read past the paywall Flaws in the construction of the UP Express near Pearson airport have led to repeated track failures since the service opened more than a decade ago. The persistent problems will likely require an expensive and disruptive solution, say experts. “Early construction defects … were identified before the line entered service in 2015,” according to the report. Those early track defects included incorrectly levelled and weakened concrete, as well as excessive grinding on the track. The obvious sign of the track problems for UP Express riders has been the notably slower speed of the trains near Pearson. “The low speed is probably because they just never could fix the track properly,” rail consultant Steve Chiu said. A long-term fix would be expensive, Chiu said, and would also require a shut down, at least partially, of the UP Express. Jeff Casello, a University of Waterloo engineering professor, said he suspects Metrolinx would need to excavate parts of the track to fix the material underneath the rails. ME: I read that the reduced speed zone on TTC Line 1 tracks near Davisville Station could have the same problem. That's why the RSZ has remained in place so long. thestar.com/news/gta/probl…
English
3
3
22
1.6K
suraj // frame 🪽 أُعيد تغريده
John Bowker
John Bowker@bowker_john·
GTA transit agencies have been cancelling routes and replacing them with a private “on demand” service delivered by Argo, the curiously well-connected technology firm formerly known as Facedrive seanmarshall.ca/2026/04/14/cal… #onpoli
English
2
42
52
4K