Caltrans District 7

35.9K posts

Caltrans District 7 banner
Caltrans District 7

Caltrans District 7

@CaltransDist7

California Department of Transportation. Site not monitored 24/7. Call 9-1-1 for emergencies. Use https://t.co/WB7ksoC3Jq for current closures.

Los Angeles & Ventura Counties Beigetreten Ocak 2009
929 Folgt64.5K Follower
Caltrans District 7
Caltrans District 7@CaltransDist7·
⚠️ UPCOMING OVERNIGHT WORK ON I-405 ⚠️ Overnight lane reductions and ramp closures happening on I-405 through the Sepulveda Pass from 9 p.m. to 6 a.m. 3/24 - 3/28. Details below. Sign up for email alerts: lp.constantcontactpages.com/sl/iF8BRAC/405
Caltrans District 7 tweet mediaCaltrans District 7 tweet mediaCaltrans District 7 tweet media
English
0
1
1
260
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧 METRO I-105 EXPRESSLANES CONSTRUCTION🚧 Metro is planning extended weekend lane reductions on WB I-105 at Western Ave on Saturday, March 28. Two inside center lanes will be closed. Construction schedules are subject to change. Find more info at Metro.net/105expresslanes
Caltrans District 7 tweet media
English
0
1
0
481
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧SR-91 OVERNIGHT CLOSURES🚧 On SR-91, overnight lane, connector & ramp closures are scheduled Mon 3/23 -Sat 3/28, from Vermont Ave in Gardena to Orange County line at postmile (PM) 20.7 in Cerritos. Detour signs will be posted. Details 🔗:dot.ca.gov/caltrans-near-…
Caltrans District 7 tweet media
English
0
1
0
538
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧 STATE ROUTE 118 IN SOMIS 🚧 State Route 118 (Los Angeles Avenue) is scheduled to have one-way alternating traffic control between Sand Canyon Road & Balcom Canyon Road. - Monday 3/23 through Thursday 3/26 - 7PM to 6AM - Slope repair. - Construction zone speed limit: 40 MPH
Caltrans District 7 tweet media
English
0
0
0
482
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧Heads up, Castaic!🚧 Pavement rehab on I-5 (Lake Hughes Rd→Vista Del Lago Rd): Mar. 22 • Up to 2 lanes: 7PM–6AM • NB/SB Lake Hughes & Templin Hwy ramps + SB truck brake ramps: 7PM–6AM Mar. 23–27 • Up to 2 lanes: 9AM–3PM and 7PM–6AM • Same ramps: 7PM–6AM
Caltrans District 7 tweet mediaCaltrans District 7 tweet media
English
0
5
3
823
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧 LOS ANGELES AVENUE IN MOORPARK 🚧 Moving lane closures scheduled in both directions of Los Angeles Avenue at multiple intersections between Tierra Rejada Road & Spring Road. -Monday 3/23 > Friday 3/27 - Right lane blocked between 7AM & 6PM daily - Electrical work
Caltrans District 7 tweet media
English
0
0
0
488
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧 AGOURA ROAD CLOSURE 🚧 📅 When: March 23 | 7 AM–5 PM  🚶 Pedestrians & Cyclists: Free shuttle service every 30 minutes during closure hours 🚗 Drivers: Detour via U.S. 101
Caltrans District 7 tweet mediaCaltrans District 7 tweet mediaCaltrans District 7 tweet mediaCaltrans District 7 tweet media
English
0
1
0
728
Caltrans District 7
Caltrans District 7@CaltransDist7·
‼️ SB I-605 LANE REDUCTIONS THIS WEEKEND ‼️ Pico Rivera: Southbound I-605 will have reduced lanes from Slauson Avenue > Telegraph Road from 10PM Friday 3/20 to 5 AM Monday 3/23. Paving operation. Details: tinyurl.com/3puhmfvv Notifications: tinyurl.com/2sv67ks3
Caltrans District 7 tweet mediaCaltrans District 7 tweet media
English
0
3
1
2.2K
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧 LOS ANGELES AVENUE IN MOORPARK 🚧 Moving operation scheduled in both directions of Los Angeles Ave at multiple intersections between Tierra Rejada Road & Spring Road. -Monday 3/23 >Thursday 3/26 -9PM to 6AM -Asphalt repair - At least one lane open in each direction
Caltrans District 7 tweet media
English
0
1
1
699
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧 VINEYARD AVENUE IN OXNARD 🚧 -Monday 3/23 > Friday 3/27 -Northbound & southbound the right lane blocked with a moving closure -Central Ave > US 101 -7PM to 6AM nightly - Paving & curb & gutter work. QuickMap.dot.ca.gov
Caltrans District 7 tweet media
English
0
0
1
612
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧 LOS ANGELES AVE IN MOORPARK 🚧 L.A. Avenue reduced to one lane in each direction at: Tierra Rejada Rd from 7PM Friday 3/20 to 10AM Saturday 3/21. And Tierra Rejada Rd & Maureen Lane from 7PM Saturday 3/21 to 12PM Sunday 3/22. Moving paving operation.
Caltrans District 7 tweet mediaCaltrans District 7 tweet media
English
0
1
1
726
Caltrans District 7
Caltrans District 7@CaltransDist7·
⚠️SR-27 LANE CLOSURES⚠️ Starting 3/23 for Verizon trenching work. 🗓️8-11:59 p.m. weekdays 📍Mile marker 1.8 south to PCH Reduced to one lane with alternating one-way traffic control where crews are working. Plan ahead & allow extra travel time. More: dot.ca.gov/caltrans-near-…
Caltrans District 7 tweet media
English
0
4
6
1.4K
Caltrans District 7 retweetet
Caltrans District 7
Caltrans District 7@CaltransDist7·
🚧 LOS ANGELES AVE IN MOORPARK 🚧 Crews will conduct nighttime, moving operations in both directions of Los Angeles Avenue at multiple intersections between Tierra Rejada Road & Spring Road Monday 3/16 >Thursday 3/19 from 9PM to 6AM. Asphalt repair.
Caltrans District 7 tweet media
English
0
3
1
1.7K