Elixir Energy Ltd

650 posts

Elixir Energy Ltd banner
Elixir Energy Ltd

Elixir Energy Ltd

@ElixirEnergyASX

Gas exploration and development company

South Australia 가입일 Ocak 2019
81 팔로잉627 팔로워
Elixir Energy Ltd 리트윗함
MarketOpen
MarketOpen@MarketOpenAUS·
$EXR Elixir Energy Limited recorded 1,033m of high quality net gas condensate pay at Lorelle 3H and completed a 1,157m lateral section within the Tinowon ‘Dunk’ Sandstone. A 30 day production test is planned in Q2 26. @ElixirEnergyASX @Stew_Walters #ASX #EXR #Gas #Energy
MarketOpen tweet media
English
0
1
1
83
Elixir Energy Ltd
Elixir Energy Ltd@ElixirEnergyASX·
$EXR Elixir Energy completed drilling, casing and cementing of Lorelle-3H. We recorded 1,033m of high quality net gas condensate pay and drilled a 1,157m lateral, the longest lateral drilled in the Taroom Trough. @Stew_Walters #EXR #ASX
Elixir Energy Ltd tweet media
English
0
0
3
95
Elixir Energy Ltd
Elixir Energy Ltd@ElixirEnergyASX·
$EXR Elixir Energy has recorded over 1,000m of net gas pay in Lorelle-3H, with we measuring 1,033m within the Tinowon ‘Dunk’ Sandstone. We have now suspended Lorelle-3H for a multi stage stimulation and production test in Q2-26. @Stew_Walters #EXR #ASX
English
0
1
6
169
Elixir Energy Ltd 리트윗함
MarketOpen
MarketOpen@MarketOpenAUS·
$EXR Elixir Energy Limited has recorded 1,033m of high quality net gas condensate pay at Lorelle 3H, with average porosity of 11.2% and maximum porosity of 18%. The well reached 4,477m MDRT including a 1,157m lateral section. @ElixirEnergyASX @Stew_Walters #ASX #EXR #Gas #Energy
MarketOpen tweet media
English
0
1
5
128
Elixir Energy Ltd
Elixir Energy Ltd@ElixirEnergyASX·
$EXR Elixir has commenced mobilisation for the Teelba 2D Seismic Campaign. We will acquire 200 km of new seismic across our western Taroom Trough acreage, on trend with the outstanding petrophysical results of the Lorelle 3 pilot well. @Stew_Walters #ASX #EXR #Energy
English
0
1
2
174
Elixir Energy Ltd 리트윗함
MarketOpen
MarketOpen@MarketOpenAUS·
$EXR Elixir Energy: Terrex Seismic has commenced mobilisation for the Teelba 2D Seismic Campaign in ATP2057 in Queensland’s Taroom Trough. 200 km of new 2D seismic is planned to start next week and take ~3 weeks. @ElixirEnergyASX @Stew_Walters #ASX #EXR #Energy #Queensland
MarketOpen tweet media
English
0
1
2
93
Elixir Energy Ltd
Elixir Energy Ltd@ElixirEnergyASX·
$EXR Elixir confirms we have drilled and cased the heel of the Lorelle 3H well through coal into the Tinowon Dunk Sandstone target. SLB completed the Horizontal Landing Optimisation Study identifying the best zone within 28m of net pay. @Stew_Walters #ASX #EXR #Energy #Gas
English
0
0
2
154
Elixir Energy Ltd 리트윗함
MarketOpen
MarketOpen@MarketOpenAUS·
$EXR Elixir Energy: Lorelle 3H heel drilled and cased through Wallabella coal into the Tinowon Dunk Sandstone at 3,319m MDRT. 7 inch liner cemented. SLB landing optimisation study identified the best zone within 28m net pay for the horizontal well bore. @ElixirEnergyASX @Stew_Walters #ASX #EXR #Gas #Queensland
MarketOpen tweet media
English
0
1
1
120