The ZL-2101 was the State’s stopgap response to the Railway Authority’s Cytus suit, but miniaturization issues with the shockflight apparatus resulted in a stature more akin to an armor deck than a hardsuit. This particular unit was attached to 2991 Borealis for regime testing.