432PA

30 posts

432PA

432PA

@432PA

Following the progress of 432 Park Avenue.

Katılım Ağustos 2012
0 Takip Edilen2 Takipçiler
432PA
432PA@432PA·
half way
432PA tweet media
English
0
0
0
0
432PA
432PA@432PA·
Concrete poor imminent for the center basement slap.
English
0
0
0
0
432PA
432PA@432PA·
In #whitecollar they showed the building next to the 432PA site.
English
0
0
0
0
432PA
432PA@432PA·
I was mistaken the #57thstreet cam is working fine.
English
0
0
0
0
432PA
432PA@432PA·
foundation works well underway! Freight elevator under water, to counter pressure? Less diggers on site. Means groundwork almost done!
English
0
0
0
0
432PA
432PA@432PA·
Looks like a lot of suits came to inspect the site! #ParkAvenue
432PA tweet media
English
0
0
0
0
432PA
432PA@432PA·
new concrete arrived. emptying the site continues today
English
0
0
0
0
432PA
432PA@432PA·
This is how much work is done in just two days. 1 pic =difference 2 pic = today 3 pic is Wednesday.
432PA tweet media
English
0
0
0
0
432PA
432PA@432PA·
Poor of the center and the two column bases are ready
English
0
0
0
0
432PA
432PA@432PA·
ready for large concrete poor of the core base. (This will house the 5 main elevators)
432PA tweet media
English
0
0
0
0
432PA
432PA@432PA·
Long work day, some workers still on site? Making sure everything is ready for the core concrete poor?
English
0
0
0
0
432PA
432PA@432PA·
Concrete poor for the two new column basses.
English
0
0
0
0
432PA
432PA@432PA·
The truck for the rebar has shrunken.
432PA tweet media
English
0
0
0
0
432PA
432PA@432PA·
Rebar for the last foundation work of the columns has arrived.
432PA tweet media
English
0
0
0
0