crypt0m1notaur

228.8K posts

crypt0m1notaur banner
crypt0m1notaur

crypt0m1notaur

@Crypt0M1notaur

dev. Crypto x NFT Nomad 🌱 Metaverse 📻 gm @maze0fdreamz 🐂💨

metaverse Присоединился Ekim 2021
8K Подписки8.4K Подписчики
Закреплённый твит
crypt0m1notaur
crypt0m1notaur@Crypt0M1notaur·
gm 𝕏erz
crypt0m1notaur tweet media
34
0
38
237
Unkonfined
Unkonfined@unkonfined·
If nobody’s replying to you, start replying to everybody.
English
1.1K
248
1.2K
26.6K
Klea 🧸
Klea 🧸@kleaweb3·
Good morning CT Bitcoin falls under $70,000 🔻 red light therapy 👀
Klea 🧸 tweet media
English
92
2
159
3K
Adelina
Adelina@Adelina_Galoyan·
GM fam🤍 Trade smarter with OKX DEX in the @Ledger wallet app! Deep multi-chain liquidity + Ledger security 🔐 Showing how fast and easy it is 🤗
English
153
46
208
3K
crypt0m1notaur ретвитнул
MULTI
MULTI@multinft·
⚡ RAGE NACHT ⚡ This Thursday 🗓 19 March / 10 PM UTC @SteveSaiko the master returns for a special 2-hour DJ set, delivering a deep journey through hypnotic techno and immersive visuals. Step into the darkness, Release the RAGE.
MULTI tweet media
English
1
10
23
1.4K
crypt0m1notaur ретвитнул
make
make@MAKEANFT·
THE META BEAST ROAMING PARTY WELCOME @AudioHotLab TO THE DECKS Hours 1&2: AUDIOHOTLAB Hours 3&4: aKIDcalledMAKE Hosted by @SinfulMeatStick & @DJvAPED 📍 MAKE’S STACK – Decentraland -22,137 🗓️ March 20th ⏰ 9PM–1AM EST | 1AM–5AM UTC Prizes : 20 USDT 50 @akidcalledbeast points Wearables for new guests
make tweet media
English
5
9
28
630
Shiru
Shiru@0xShiru·
#ToPerle Community Voice Campaign is live 🎙️ $55,000 prize pool up for grabs with 400+ winners, Discord only How to join: • Drop an original tweet about Perle (thoughts, vision, memes, anything creative) • Use #PerleAI + #ToPerle • End with: “ participating in @PerleLabs community campaign” • Submit: CHECK COMMENTS SECTION 📅 March 18 — March 27 🏆 Reward breakdown: 🥇 Top 1–50 → $350 each 🥈 Top 51–150 → $200 each 🥉 Top 151–400 → $50 each 🎖️ Extra 5,000 USD1 pool for Voyager + Navigator roles Winners picked based on quality, originality & engagement Say what you really think about Perle this one rewards real voices 🚀
Shiru tweet media
English
39
19
45
295
Kane ad
Kane ad@Kanead47·
Ever feel like your crypto assets are stuck in one place? Meet River @RiverdotInc & @River4fun a revolutionary chain abstraction stablecoin system designed to make your assets flow everywhere 🪙 $River bridges the gap between different blockchain networks
River@RiverdotInc

Season 4 is ongoing ▸ S4 ends on the final day of the River Pts conversion window (Day 210) ▸ Both are expected to wrap up in late April ▸ River Pts remain convertible after S4 Exact timelines and conversion rules will be confirmed through official channels. Thank you for your continued support.

English
38
25
48
511
Mide(evm/acc)
Mide(evm/acc)@OOwopeju8992·
Spent some time actually using @grvt_io mobile app today instead of just reading threads about it, and one thing genuinely caught me off guard. I opened a BTC perp position expecting the usual behavior I’m used to on most platforms. Normally, once you commit capital to a trade, that portion of your balance basically goes idle. It’s locked into margin and stops doing anything productive. But here’s what felt different, While the position was open, my balance didn’t feel locked away, instead It was still actively working in the background. I didn’t have to split funds, move assets between accounts, or think about allocating capital separately for earning vs trading. Everything just stayed in one place and kept functioning. After a few minutes, it clicked to me what was actually happening. The platform is designed so your collateral isn’t just sitting there, it’s still part of a system where it can generate yield while you trade. That changes the mental model completely. Instead of thinking: How much capital do I leave idle vs how much do I trade with ? It becomes: My capital stays productive regardless. It sounds small, but when you’ve used enough exchanges, you realize how much friction usually comes from constantly managing where funds sit. Here, I didn’t have to think about that at all. That’s probably the first time a trading app made me feel like my capital was actually being used efficiently without extra effort.
Mide(evm/acc) tweet mediaMide(evm/acc) tweet media
English
50
67
162
26.5K
Ledger
Ledger@Ledger·
2018. Ledger assembles a team of world-class hackers and gives them one instruction: Stress-testing everything we make. Here’s how the @DonjonLedger was born 🧵
Ledger tweet media
English
126
59
182
9.1K
NABULINES
NABULINES@nabulines·
gm gm real ones...☀️
NABULINES tweet media
English
167
71
188
1.7K
crypt0m1notaur ретвитнул
nabu
nabu@nabu_lines·
$1000💰 for 10 to enter: - follow me & @nabulines - RT this post - check here in 2 hours
nabu tweet media
English
416
424
538
11.5K
delina
delina@delinabase·
good morning my dear's have a wonderful day's☀️☀️
delina tweet media
English
19
1
21
210
Xercker 🫟
Xercker 🫟@Xerckerr·
Do you have at least 1,000 followers on X and want to earn while you create, learn, and interact? 👇 ​🔹Stop playing alone. We're here to help you. 🤝 ​At @nabulines, we've created a system where the COMMUNITY is the driving force. We build relationships, promote posts, and share exclusive opportunities. ​Your roadmap to get started: ​🔗 Step 1: Register here: raid-delta.vercel.app/ref/RAID28HY 📱 Step 2: Connect your X account. 🔔 Step 3: Follow @nabulines - @nabu_lines. 👥 Step 4: Join the Telegram group: t.me/+ISqazYJVHRw0Z… ​💡 IMPORTANT: Go to the support channel in the Telegram group so the team can verify your identity using your X profile link. ​Once APPROVED ✅, the bot will be your best ally. ​🔥 Step 5: Interact. 💪 Step 6: Be consistent and WIN. ​Are you going to discover the opportunity yourself, or will you wait for others to tell you about it? 👊 ​Note: If you have any questions, feel free to DM me and I’ll assist you. ​In the Nabulines Community, we’re waiting for you! 🫵😉
Xercker 🫟 tweet media
nabu@nabu_lines

$1000💰giveaway - follow me & @nabulines - RT this post - quest link in 60min

English
71
27
92
2.1K
0x_Zane
0x_Zane@Defi0x_Zane·
#1 with 15k pts 🙌 Massive thank you @nabu_lines for this legit challenge and for valuing real contribution Props to all top yappers – we elevated each other 👁️⃤ Leaderboard reset. Round 2 starts now… let’s keep building!
nabu@nabu_lines

top yappers didn’t just show up they put in time, added context, and elevated others @Defi0x_Zane — 15k pts @Xerckerr — 10k pts @delinabase — 7.5k pts 🚨extra part of the reward = the community follows you as a 420pts task👁️⃤ leaderboard reset next round is on

English
54
31
81
2.1K