frodolagging⁷⁼¹ ARIRANG

44.8K posts

frodolagging⁷⁼¹ ARIRANG banner
frodolagging⁷⁼¹ ARIRANG

frodolagging⁷⁼¹ ARIRANG

@frodolagging

“Please stay there a while longer” • millenial she/her •🚫: ✈️/fansites/unofficial content • hope my pinned post comforts you 💜 #MOREto100M #BTSARMYSTAYHOME

شامل ہوئے Kasım 2022
419 فالونگ229 فالوورز
پن کیا گیا ٹویٹ
frodolagging⁷⁼¹ ARIRANG
frodolagging⁷⁼¹ ARIRANG@frodolagging·
These words bring so much meaning for me. I owe you a lot Min Yoongi for this peace and piece you gave when I needed it the most. So I brought it along with me. #AgustD_DDAY_theFinal
frodolagging⁷⁼¹ ARIRANG tweet media
English
2
2
15
14.6K
frodolagging⁷⁼¹ ARIRANG ری ٹویٹ کیا
winyyy⁷ 🪭 ⊙⊝⊜
winyyy⁷ 🪭 ⊙⊝⊜@flowerworks__·
This account is spoiling the setlist, if you want to block
winyyy⁷ 🪭 ⊙⊝⊜ tweet media
English
2
10
11
463
frodolagging⁷⁼¹ ARIRANG ری ٹویٹ کیا
Kay
Kay@kayrh11·
BTS blocking all of these artists is very satisfying.
Kay tweet media
English
1
4
4
32
frodolagging⁷⁼¹ ARIRANG ری ٹویٹ کیا
Genius
Genius@Genius·
BTS’ 'ARIRANG' tops the billboard 200 for a second consecutive week 📈🎶 the album earned 187,000 equivalent album units in the US, following its massive 641,000-unit debut, the biggest opening week of 2026 so far. BTS now becomes the first k-pop act to have an album spend two straight weeks at no. 1 on the billboard 200 🤯
Genius tweet mediaGenius tweet media
English
7
1.6K
4.5K
33.3K
frodolagging⁷⁼¹ ARIRANG ری ٹویٹ کیا
VOGUE JAPAN
VOGUE JAPAN@voguejp·
#BTS のSuga, RM, Jung Kook, J-Hopeが登場!韓国語”ケンチャナ”の使い方を指南。
日本語
6
1.2K
3.6K
34.2K
frodolagging⁷⁼¹ ARIRANG ری ٹویٹ کیا
Reita ⟭⟬ 𝔹𝕋𝕊 𝕚𝕤 𝔹𝕒𝕔𝕜 ⟬⟭
我永遠不會拿排行榜成績來吹噓,因為知道所有國家的阿米(尤其是美國阿米)付出了多少心血才能有這樣的成績。感謝所有發起集資、慷慨捐款、跑遍各大實體通路、持續聽歌、堅守崗位的每一位阿米,這份榮耀屬於你們💜 最近看到好多風涼話好難過🥲
中文
2
1
72
1.1K
please no.1 fan
please no.1 fan@mintaegi__·
@frodolagging they're arguing bts is just not the biggest in general when the mere clip of a bts episode on their ig has 10 million views alone and the rest non-bts videos are around 200k - 300k 😹
English
1
0
1
52
frodolagging⁷⁼¹ ARIRANG ری ٹویٹ کیا
Cypher⁷ / Shesawseesaw
Cypher⁷ / Shesawseesaw@cypherluscious·
Interesting read! (It's behind a pay wall so read the thread. If you do have a subscription you can read the article here: vanityfair.com/hollywood/stor…)
Seeingbtsin3weeks@orul8ce

Director Bao Nguyen and coproducer Jane Cha Cutler talk to Vanity Fair about the making of their new documentary, BTS: The Return. A thread 1. Vanity Fair: Can you tell me a bit about how this documentary came about? Why did you decide to make a documentary about BTS? Bao Nguyen: I went to go see BTS at one of their SoFi [Stadium] shows. I love live music, but that was the loudest concert I’ve ever been to, and just feeling the energy of the group onstage was something that was really inspiring to me. If you go to a BTS concert, you know that they can really bring the crowd in in an intimate way through their dialogue with the fans. When they were having one of these conversations with the fans and talking about going on hiatus soon, it reminded me of the Homeric myth of The Odyssey—BTS being Odysseus about to go into the military, and ARMY being Penelope, longing for their heroes. So that just made me think this could be an amazing film. I talked to Hybe about that. It didn’t work out at that time, because military service is very private and secretive, as it should be. It was a few years later, when they came out of the military, that James Shin [president of film and television at Hybe America] reached out to me and told me, “Remember when you pitched me this idea of BTS being The Odyssey? Well, they’re back, and we’d totally be interested in working with you.” He was in talks with This Machine and Jane [Cha Cutler], and Jane and I had been developing a project in the past for a while that didn’t work out. So I jumped at the opportunity to work with Jane.

English
1
32
73
2.5K
frodolagging⁷⁼¹ ARIRANG
Being compared to The Beatles multiple times, this part is relatable too. The stigma started way back and still ongoing and only time will tell (read: wdgaf). Loving and fangirling over BTS has never reduced my self-worth. #BTSARMY
English
0
0
6
90
frodolagging⁷⁼¹ ARIRANG ری ٹویٹ کیا
kitty
kitty@invictumsuga·
HOOLIGAN
kitty tweet media
Eesti
32
3.3K
22.5K
159.7K
frodolagging⁷⁼¹ ARIRANG
The open parking space like this will sure make any new drivers anxious. Endless traffic coming right when u are about to park. Oh my Namjoon #relatable
frodolagging⁷⁼¹ ARIRANG tweet media
English
0
0
0
15