Taxonomist
16K posts

Taxonomist
@BeastsInJars
🎶Sylvia keeps ...🎶 I walk alone. Unfollow Everything. Came for Spitter, subscribed for Grok.

















NG-3 Update: We have confirmed payload separation. AST SpaceMobile has confirmed the satellite has powered on. The payload was placed into an off-nominal orbit. We are currently assessing and will update when we have more detailed information.








NG-3 Update: We have confirmed payload separation. AST SpaceMobile has confirmed the satellite has powered on. The payload was placed into an off-nominal orbit. We are currently assessing and will update when we have more detailed information.


If you are referencing the Maroon track, that would be for the GS-2 ascent contingency area. The Maroon region represents the 'sudden GS-2 engine cutoff ballistic path' that the stage would follow. When a rocket is still relatively new the hazard zone/risk is increased in size and length. So we can expect in the next few flights we can expect the deletion of the hazard. The Blue pinpoint is GS-1 recovery, and green is for the fairings.













