
Bryan Lewis
277 posts

Bryan Lewis
@BryanLewis2000
Creative Ux/Ui Designer and No-Code Webflow Developer, who loves design experiences that users love . Future #FPVdronePilot


This same source reminded me today that he predicted New Glenn's first launch would occur in 2025. Back in 2018. For real.




Update: I am looking for a chief of staff for myself.



This is the way...







Starship Super Heavy Booster Flight 4

Also the full video. Engine cut - off too high. May be the altimeter went wrong

HARMONY OF RESILIENCE: Recorded in space and sent to Earth via @SpaceX’s @Starlink constellation, Polaris Dawn crewmember and violinist @Gillis_SarahE invites you to enjoy this music moment in support of @StJude & @ElSistemaUSA → polarisprogram.com/music

Some context: Mobile Launcher -1 (ML-1) was converted from the canceled use with Ares into the ML for SLS Block 1. With the addition of the EUS (Exploration Upper Stage) for the Block 1B SLS, the option was to convert ML-1 to accommodate the height increase of the vehicle or build a new one. A new one was cited at around $450m, and the option was taken based on the expected downtime of ML-1 during conversion, which would have meant no SLS launches for a few years during this period. ML-2 is currently being constructed but has suffered from delays and contractor issues. The OIG now estimates it at $1.8 billion, which is some cost rise. ML-2 articles over the years: nasaspaceflight.com/?s=ML-2










