Adron Robinson
17.5K posts

Adron Robinson
@AD_Nice3
Adri's Dad; Niceville HS Head Football Coach; 2021 Mickey Andrews Asst Coach of the Year; Head Coach Flag Football

After a great camp I’ve been blessed to receive a d1 offer from Gardner Webb University @Coach_KD75 @AD_Nice3 @XavierGraham72_ @CoachK__Mac @GWUFootball




















’28 DT/OL Tri’marcus Mays (@Big_memphis13) of @Niceville_Fb was the most dominant performer at @TroyTrojansFB camp. At 6’0”, 315 lbs, Mays showcased an impressive combination of quickness, power, and finesse on both sides of the ball. On offense, he displayed excellent balance and body control throughout 1v1s, consistently maintaining leverage while using strong, violent hands to control defenders. Defensively, he overwhelmed opponents with his explosiveness off the snap, physicality at the point of attack, and relentless motor. He also showed outstanding footwork for a player of his size, moving efficiently while remaining under control throughout competition. Already holding 🅾️s from Samford University and the University of Nevada, Las Vegas (UNLV), Mays continues to build momentum on the recruiting trail. @AdebanjiBamide1 @AD_Nice3 @PatB5153


’28 DT/OL Tri’marcus Mays (@Big_memphis13) of @Niceville_Fb was the most dominant performer at @TroyTrojansFB camp. At 6’0”, 315 lbs, Mays showcased an impressive combination of quickness, power, and finesse on both sides of the ball. On offense, he displayed excellent balance and body control throughout 1v1s, consistently maintaining leverage while using strong, violent hands to control defenders. Defensively, he overwhelmed opponents with his explosiveness off the snap, physicality at the point of attack, and relentless motor. He also showed outstanding footwork for a player of his size, moving efficiently while remaining under control throughout competition. Already holding 🅾️s from Samford University and the University of Nevada, Las Vegas (UNLV), Mays continues to build momentum on the recruiting trail. @AdebanjiBamide1 @AD_Nice3 @PatB5153






