Alex

230.8K posts

Alex banner
Alex

Alex

@Ajsoti

Too Hockey for political Twitter. Too political for Hockey Twitter. 718 I root for all the cool NY teams.

Queens, NY Katılım Temmuz 2010
981 Takip Edilen1.9K Takipçiler
Alex
Alex@Ajsoti·
@teddy_fore1 Is Hochul's decision based on power consumption metrics or politics? LOl we still dont have answer from the expert. What a shock. Get lost.
English
0
0
0
6
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti Bye dude, this was fun No thanks needed for educating you It took you awhile to grasp very basic concepts But you got there eventually Congrats kiddo
English
1
0
0
8
Alex
Alex@Ajsoti·
Behind-the-meter is not some corporate attempt to “escape government.” It is a market response to a government-controlled grid that has become too constrained by its own bullshit permitting and policy decisions.
Teddy_four@teddy_fore1

@Ajsoti @litcapital You think big business is in the idea of having more regulation and waiting for grid connection M&M’s from the state Behind the meter is escaping government overreach on load usage Christ dude, just stop, every comment makes you look fucking retarded

English
1
0
0
92
Alex
Alex@Ajsoti·
@teddy_fore1 said the guy that ahahahahahahahahahaha 15x. Your inital point is wrong. Fin.
English
2
0
0
14
Alex
Alex@Ajsoti·
@teddy_fore1 There go those LOL's to pretzel the point. Perhaps use Ai to explain the distinction
English
0
0
0
5
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti Dunhhh data center don’t need cooling LOL
English
2
0
0
7
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti I’m still laughing at the data center claim in hot weather. LOL
English
1
0
0
9
Alex
Alex@Ajsoti·
@teddy_fore1 Only fucking morons see this any other way. I suppose that's you.
English
1
0
0
22
Alex
Alex@Ajsoti·
@teddy_fore1 “mid tier NY power” might be the weakest excuse yet. NY has the resources and the ability to build generation and transmission. What it doesn’t have is a pol environment willing to let it happen. Hochul’s hesitation is about policy and optics, not the laws of fkn electricity.
English
2
0
0
26
Alex
Alex@Ajsoti·
@teddy_fore1 @litcapital Behind-the-meter is not some corporate attempt to “escape government.” It is a market response to a government-controlled grid that has become too constrained by its own bullshit permitting and policy decisions.
English
1
0
0
10
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti @litcapital You think big business is in the idea of having more regulation and waiting for grid connection M&M’s from the state Behind the meter is escaping government overreach on load usage Christ dude, just stop, every comment makes you look fucking retarded
English
1
0
0
94
Alex
Alex@Ajsoti·
@teddy_fore1 @litcapital Your entire premise is backwards. NY does not lack energy resources — . The bottleneck is not that the state is physically incapable of powering data centers. & you're trying to be snarky to mask your point being ass backwards
English
0
0
0
7
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti @litcapital Duuuuhhhhh data centers wouldn’t use more energy on hot days Keep going dude You’re killing it out here with hot takes
English
1
0
0
7
Alex
Alex@Ajsoti·
@teddy_fore1 @litcapital The constant unhinged Hahahahahahahha is telling. I guarantee you no one that works in the space is sitting back and saying “wow Hochul is being prudent here”
English
1
0
0
13
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti @litcapital Hahahahahahaha This retard said “behind the meter” Doesn’t matter when 72% of new hyperscaler data centers are behind the meter This is hilarious seeing retards who don’t even work in the space trying to talk like they have any clue.
English
1
0
0
10
Alex
Alex@Ajsoti·
@teddy_fore1 @litcapital This is why utility companies with power to spare often actively court data centers to move into the areas they serve. but keep hahahahahahahaha & LOLOLOLOLOLOL to make yourself feel better
English
1
0
0
10
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti @litcapital Duhhhh “keep saying behind the meter like it means anything” The stratos project which is the largest in the USA is behind the meter LOLOLOLOL
English
1
0
0
8
Alex
Alex@Ajsoti·
@teddy_fore1 @litcapital data centers are often ideal customers for utility grids because their power consumption is predictable and steady. Their demand doesn't surge on hot days, as when everyone in an apartment building turns on their air conditioners.
English
2
0
0
15
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti @litcapital You’re so clueless in this space it blows my mind. Ken Griffin, Steve Cohen, Peter Thiel all saying the shift to behind-the-meter is the way to go to increase time to power and bypass state grid connections, reduce the Load on state population . Hahahahahahahah
English
1
0
0
23
Alex
Alex@Ajsoti·
@teddy_fore1 @litcapital LOL Data centers are being bult in areas w FAR less resources than New York you fool. Your argument sounds smart but it is not. But keep saying "behind the meter" like it fucking means anything of merit.
English
2
0
0
23
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti @litcapital Hence Behind the Meter genius you havew to be retarded, nobody is this stupid on this industry
English
1
0
0
12
Alex
Alex@Ajsoti·
@teddy_fore1 @litcapital The constraint is not a lack of resources; it is the ability to develop and deliver reliable, affordable power. New York consistently makes shit policy choices, just like this one.... Genius.
English
1
0
0
14
Alex
Alex@Ajsoti·
Picked the wrong day to buy IBM & Lucid
English
0
0
0
72
Alex
Alex@Ajsoti·
@teddy_fore1 @litcapital Willfully torpedoing a power plant then saying this is not a resource rich state is a level of obtuse I didn't know existed. Btw that data center is going to be built this is merely posturing so the right people get the right envelopes and contracts for the job.
English
1
0
0
20
Teddy_four
Teddy_four@teddy_fore1·
@Ajsoti @litcapital It’s not a resource rich state Why are people shocked that a state that isn’t some energy power house isn’t prioritizing data centers At-the-meter are still available in the state and the entire industry is shifting to it.
English
1
0
0
23