Sabitlenmiş Tweet
Joel Building Technologist
26.3K posts

Joel Building Technologist
@CPM_Mutuse
Design and Build. DM for Construction Business. 📧 [email protected]
Nairobi, Kenya Katılım Mayıs 2022
848 Takip Edilen56.3K Takipçiler

Design and build.
Ja Leto@_falsi1ke
If algorithms brings this to you, Quote this tweet with anything
English

Most 'sustainable' building engineers still optimize for minimum concrete while ignoring that Starship class reusable forms could drop structural embodied carbon 70-80% via sheer scale + rapid reuse. First principles say we should be mass-producing reusable mega-formwork, not tweaking one-off pours. Thoughts?
English

Something that still doesn’t get enough recognition,
@elonmusk made the entire auto industry to take electric vehicles seriously.
Before Tesla, EVs were treated like side projects.
Now every major manufacturer is racing toward electrification.
One company didn’t just build cars it changed the direction of an entire industry. ⚡
English
Joel Building Technologist retweetledi

@BSAT_Properties Whats the square area for this building
English

🛑4-BEDROOMS MATERIAL ESTIMATE:🛑
Total Estimate for a 4-Bedroom Bungalow. (Note: there maybe variations depending on location,sizes and time)
This comprehensive breakdown outlines the estimated materials for constructing a 4-bedroom bungalow,
📌 BL0CK, CEMENT
1. 4,058 blocks (6"inches hollow block).
2.foundation blinding=30 bags of cement.
3. block work=33 bags of cement.
4. D.P.C= 79 bags of cement.
5. Columns casting=28 bags of cement.
6. Lintel=29 bags of cement.
7. Parapet =54 bags of cement.
8. Total bags of cement=253 bags.
📌SAND AND ST0NE:
1. 4 carrygo of sharp sand.
2. 40 tones of 3¼ stone.
3. 8 tones of 3⅛ stone for parapet.
📌IR0N (REINF0RCEMENT):
1. 42 lengths of 12mm rod for lintel.
2. 23 lengths of 12mm rod for column.
3. 40 lengths of 8mm rod for links.
4. One roll of binding wire.
5. 24 lengths of 12mm rod for parapet.
6. 60 lengths of 10mm for parapet.
7. 15 lengths of quarter rod.
*. Total= 89 lengths of 12mm.
*. 60 lengths of 10mm.
📌WOOD F0R LINTEL AND COLUMNS
1. Columns and lintel=60 lengths of 1x12x12 planks.
2. 20 lengths of 1x6x12
3. 40 lengths of purlins.
4. 1 bag of 3" inches nail.
📌 FACIAL CONCRETE
1. 50 lengths of 1x12x12
2. 38 lengths of 1x3x12
3. 28 lengths of 1x7 x12
4. 38 lengths of 1x4x12
5. 70 lengths of purlins.
6. One bag of 3" inches nail.
7. One bag of 2"inches nail.
📌R00FING:;
1. 34 lengths of 4x4x12 wallplate.
2. 420 lengths of 2x4x12 rafters.
3. 700 lengths of purlins.
4. 4 bags of 3"inches nail.
5. 2 bags of 4"inches nail.
📌 R00FING SHEETS:
1. 500 square meters of aluminum stone tiles.
2. 35 square meters of aluminum for flashes.
3. 1½ cartons of aluminum nails.
4. 4 number of silicon.
🛑Pls note: The cost estimates of building a 4-bedroom bungalow in Nigeria🇳🇬 depends 0n various factors such as your preferences, location, land type, design, sizes and finishing/taste.
Therefore, it is not fixed. Meaning it can be more than or less than the estimate below. But this is just t0 guide you during planning.
Ahmed Inusa

English


Structural Misconception in Building 🚧.
Thread 👇
1. A dangerous misconception is gaining traction in construction discussions online.
There is a growing belief that once a ground beam is cast, a column can simply be placed within it to support one or even two additional floors.
This assumption is fundamentally incorrect.

English