#CitypowerUpdate#HursthillSDC
Roosevelt Park Substation, Northcliff North Distributor: Repairs are complete. Operators have been requested to commence with the restoration process.
The outage was caused by a cable fault and it affects Customers in Blackheath, Northriding, and surroundings.
We will continue to keep affected customers informed of any developments and we apologise for the inconvenience caused.
Follow the Hursthill SDC Outage Updates channel on WhatsApp:
whatsapp.com/channel/0029Va…
For individual outages or electricity-related queries, please log a call via citypower.mobi or contact 011 490 7484 / 080 020 2925. For escalations, dial 0800 003 156 (06:00–18:00).^NN
@CityPowerJhb 9 hours later and we still do not have power in Allens Nek. Can we have an update? What have the techs concluded from their monitoring and has the load been stabilised?
#CityPowerUpdates#PlannedMaintenance#MidrandSDC
The planned maintenance at Noordwyk Substation, which is affecting the areas mentioned above is still underway. The estimated time of restoration (ETR) is still 17h00 provided everything goes accordingly.^MJ
#CityPowerUpdates#CityPowerOutages#RoodepoortSDC
Panorama Switching Station (Weltebredenpark and surrounding areas): Supply has been restored up to 65%.
For now, Jim Fouche Road, Constantia Square, Bontebok Avenue, Bontebok, Duiker Street, Panorama View, Park Avenue, Duiker Street No 2, Monte Christo, Kudu No 3, Kudu No 1, Kudu, Westwood Office, Kudu No 2, Diamond Acres, Wedgewood, Berasight, IC Nissan Van Vuuren Street and Van Vuuren No 3 will remain off until the load settles.
Operators will remain on site and restore each distributor when the load settles.
Please be patient as our team works towards resolving this outage.
For isolated individual outages and any other electricity-related queries, customers are advised to log calls via citypower.mobi, or contact our Call Centre on 011 490 7484 / 0800 202 925. For outage updates, follow our WhatsApp channel: whatsapp.com/channel/0029Va… ^NT
#CityPowerUpdates#CityPowerOutages#RoodepoortSDC
Operators are aware that some areas did not restore following the are wide outage affecting customers feeding from Roodetown, Kloofendaal, Ontdekkers, Nursery, Florida North, Peter Road Substations.
One team remains on site monitoring the load affecting areas such as Wilgeheuwel and surrounds while the other team is investigating areas such as Weltevredenpark that did not restore.
The initial outage was caused by faults on the 88kV double circuit overhead lines.
Further details will be shared after the tests are completed.
For isolated individual outages and any other electricity-related queries, customers are advised to log calls via citypower.mobi, or contact our Call Centre on 011 490 7484 / 0800 202 925. For outage updates, follow our WhatsApp channel: whatsapp.com/channel/0029Va… ^NT
#CityPowerUpdates#CityPowerOutages#RoodepoortSDC
Full supply has been restored to customers feeding from the Roodetown, Kloofendaal, Ontdekkers, Nursery, Florida North, Peter Road, Penny Street, Manufacta and Roodepoort substations and switching stations.
The outage was caused by faults on the 88kV double circuit overhead lines.
We thank all customers for their patience and understanding during this time.
For isolated individual outages and any other electricity-related queries, customers are advised to log calls via citypower.mobi, or contact our Call Centre on 011 490 7484 / 0800 202 925. For outage updates, follow our WhatsApp channel: whatsapp.com/channel/0029Va… ^NT
#CityPowerUpdates#RoodepoortSDC
Panorama Switching Station( (Allen's Nek, Weltevreden Park, and possible surrounding areas):
The cable between Jim Fouché and Panorama Switching Station has been identified with an open circuit on the blue phase, approximately 50m from the station.The team is currently assessing the fault and will commence with the necessary repairs.
A fault has been located on the line between Monti Christo and Kudo No. 3. The identified fault must be repaired in order to enable back-feeding of affected load centres.
Restoration efforts will continue once repairs are completed and network stability is confirmed.
Affected customers will be kept informed as more information becomes available.
Affected customers will be updated as soon as more information becomes available.
We apologise for the inconvenience caused.
For isolated individual outages or any other electricity-related queries, customers are advised to log calls via citypower.mobi.
For outage updates, follow our WhatsApp channel:
whatsapp.com/channel/ 0029VaQhJskKgsNmmmCkb81V
^KM
@CityPowerJhb But what is the old info? That the power is out? Because that's all you've updated us with! And shocking as it may be, we are aware that the power is indeed off!
#CityPowerUpdates#CityPowerOutages#RoodepoortSDC
We are aware of an unplanned power interruption affecting customers in Allen’s Nek, Weltevredenpark, and other surrounding areas.
The team has been informed to investigate the cause of the outage.
Further details will be communicated as soon as new information becomes available.
We apologise for the inconvenience caused.
Follow the Roodepoort SDC Outage Updates channel on WhatsApp: whatsapp.com/channel/0029Va… as well as on social media @CityPowerJhb. For isolated individual calls and any other electricity-related queries, customers are advised to log calls on citypower.mobi, call 011 490 7484 or the Call Centre on +27 80 020 2925. ^ZD
#CityPowerServices#CityPowerEngages
STAGE 2 LOADSHEDDING IMPLEMENTED FROM 16:00 UNTIL FURTHER NOTICE
City Power wishes to inform customers that Stage 2 loadshedding has been implemented from 16:00 today and will remain in effect until 05:00 tomorrow 25th April 2025, following the announcement made by the national power utility - Eskom.^RM
#CityPowerUpdates#LoadsheddingStage2
Loadshedding stage 2 is in progress until further notice.
Blocks 3 and 4 will be affected from 18h00 until 20h30.
Customers are urged to switch off non-essential appliances to avoid inrush current and network overload when restoration takes place.
To download the loadshedding schedule and blocks, please click on the link below: citypower.co.za/customer-servi…. ^ZD
#CityPowerUpdates#LoadsheddingStage2
Loadshedding stage 2 is in progress until further notice.
Blocks 11, and 12 will be affected from 16h00 until 18h30.
Customers are urged to switch off non-essential appliances to avoid inrush current and network overload when restoration takes place.
To download the loadshedding schedule and blocks, please click on the link below: citypower.co.za/customer-servi…. ^ZD
#CityPowerUpdates#RoodepoortSDC
Penny St Switching Station Collete Rd Distributor: Power is partially restored.
6 Load Centers will remain off until repairs have been completed.
We apologise for the inconvenience caused.
For isolated, individual electricity related queries, customers are advised to log calls at citypower.mobi or call 011 480 7484.
Stay updated and informed on area outages at the Roodepoort SDC by following our WhatsApp channel:whatsapp.com/channel/0029Va… ^KM
#CityPowerUpdates#CityPowerOutages#RoodepoortSDC
Roodepoort SDC Outage Update
JG Strydom Switching Station (Weltevredenpark): The Ring Main Unit was damaged following the flash on the cables. It needs to be replaced. We will update further on the developments.^MR
#CityPowerUpdates#RoodepoortSDC
Tshepisong Switching Station (Line A and D): Power has been fully restored.
We thank customers for their understanding and patience all the times.^LP