PCov Tactical Card Game

2.8K posts

PCov Tactical Card Game banner
PCov Tactical Card Game

PCov Tactical Card Game

@PHXCovenant

Game Developers, Lovers of #dnd, #boardgame, #ttrpg and #miniaturepainting Come check out our boardgame @ https://t.co/6szB4gapb2

NYC Katılım Temmuz 2013
2.2K Takip Edilen915 Takipçiler
Tycho Brahe
Tycho Brahe@TychoBrahe·
There really isn't anything like @PhantomBrigade_, which is going to make it difficult to review - you can't map a bunch of skills you already developed. It took me a long time to figure it out for that reason. But I'm glad I did.
English
6
1
35
10.3K
PCov Tactical Card Game retweetledi
Danielle Standring
Danielle Standring@dani_standring·
Tabletop Simulator went unplayed for months because I didn’t know how to use it/ I was too lazy to figure it out. Now it’s my BFF 👯‍♀️ Hope this helps someone, somewhere. #boardgames #tabletop
English
18
23
129
0
PCov Tactical Card Game retweetledi
HikariGamesStudio
HikariGamesStudio@games_hikari·
What is everyone’s feelings about Azul and #Abstract #boardgames as a whole? Asking for a fried
GIF
English
1
1
3
0
PCov Tactical Card Game
PCov Tactical Card Game@PHXCovenant·
@TychoBrahe It is a great concept that struggles with a shift to reality, as the entire game is just team deathmatch with monster hunting notionally there in the background. It is more efficient to camp monster than do them, and better weapons are locked behind an experience wall...
English
0
0
0
0
Tycho Brahe
Tycho Brahe@TychoBrahe·
Hunt: Showdown looks really cool. Is it?
English
14
0
21
0
Animal Crossing World 🏝️
Animal Crossing World 🏝️@ACWorldBlog·
What DIY recipe did you find in a Message Bottle on your beach today? 🏝️ I found a Gold Screen Wall! #ACNH
Animal Crossing World 🏝️ tweet media
English
91
13
796
0
PCov Tactical Card Game
PCov Tactical Card Game@PHXCovenant·
@Sllayt3r If you've played the Witcher 2, it is a lot easier to dive into 3 because you already have a strong connection to Geralt, kinda like the early levels in Odyseey connecting you to Kassandra/Alexios. Hitting key quests like the Bloody Baron is also recommended before going wide.
English
0
0
0
0
Sllay3r
Sllay3r@Sllayt3r·
@PHXCovenant Thing is the two you mention are easily in my top 10, loved them, but the Witcher, I just don’t know.
English
1
0
0
0
Sllay3r
Sllay3r@Sllayt3r·
@PHXCovenant I’m not sure, I enjoyed it for a little, then it seemed to just get too difficult. Probably the fact there’s a LOT to do and I didn’t have the time back then!
English
1
0
0
0
Sllay3r
Sllay3r@Sllayt3r·
@PHXCovenant I didn’t really get into the game that well either, so maybe that!
English
1
0
0
0