dickenson

2.1K posts

dickenson banner
dickenson

dickenson

@Pghsld

i love warships

Katılım Ağustos 2023
696 Takip Edilen284 Takipçiler
Sabitlenmiş Tweet
dickenson
dickenson@Pghsld·
Future Indian air launched precision guided munitions/SOWs/ALCMs.
dickenson tweet media
English
8
35
228
13.4K
dickenson
dickenson@Pghsld·
Just pass Ism 2.0, Pli 2.0 and NEP 2026 already bruh.
English
5
4
56
1.3K
Pk
Pk@pk00202500·
@theanonlurker it's theoretical subsidy doubling !!! reality mein ism2 is only $11B or ~1.2lakh cr !! the way it is being delayed i feeel likely cancelled bcz of money needed to fund other schemes like gasification, shipbuilding,etc
English
3
0
10
274
Kuru
Kuru@Mandhatr99·
@Avnk90 @Satvik_Pen because capital intesive is easier than labour one. people forget modi tried to make changes in 2015 and was met with protests…..
English
1
0
1
18
Anamika 💊🩺
Anamika 💊🩺@TheRubric_Medic·
In our search for a diamond, we lost gold and got coal instead…
Anamika 💊🩺 tweet media
English
17
60
417
8.8K
dickenson
dickenson@Pghsld·
Proposed outlay of $20 billion in Ism 2.0, would bring the country closer to or ahead of nations like South Korea, Japan, Malaysia, Vietnam and Singapore, but still lower than China’s $94.9 billion semiconductor support package. business-standard.com/industry/news/…
English
3
15
86
1.2K
dickenson retweetledi
IISc Bangalore
IISc Bangalore@iiscbangalore·
IISc researchers, with collaborators, have engineered silicon-compatible lead-free thin films for future 5G/6G & adaptive electronics. The materials combine high electrical responsiveness with strong thermal and frequency stability. Read: iisc.ac.in/silicon-meets-…
IISc Bangalore tweet mediaIISc Bangalore tweet media
English
4
40
264
8.7K
dickenson retweetledi
Roy
Roy@TheMinuend·
Been a long-time critic of India’s obsolete & inadequate transmission/grid, but that’s beginning to change. Tata Power’s aggressive shift from InterState (ISTS) to IntraState (InSTS) transmission reflects a major structural pivot in India’s grid strategy for the green energy era. States finally realising weak intra-state grids cannot absorb rising solar, wind & PSP loads without congestion, curtailment, or instability. The Draft NEP 2026 explicitly makes intra-state transmission strengthening a national priority. 2 key shifts: -Private capital shifting from risky generation projects toward stable, regulated transmission assets. -States gradually moving away from inefficient cost-plus RTM monopolies toward more competitive TBCB-based transmission bidding. Earlier, state-owned utilities built lines & passed all inefficiencies onto the consumer. Grid infra—not generation capacity—is the true bottleneck in RE energy expansion. India delayed grid upgrade, something even China continues to grapple with.
Roy tweet media
Roy@TheMinuend

Who hurt you AP? Transco is going ballistic on power grids & infra. AP set to add 15,000 MVA transformation capacity & 1,822 ckm of transmission lines, along with new 400/220/132 kV substations to improve stability & voltage reliability. Also enable RE, including EHT infra for solar mfg hubs in Nellore & grid integration support via 3 GWh BESS. Plus, advancing Green Energy Corridor Phase III proposals (₹22,000 cr) to evacuate large-scale solar & pumped storage capacity, alongside approvals for 100 additional transmission projects.

English
0
16
73
2K
dickenson retweetledi
Dhiraj
Dhiraj@IndustrlPolicy·
"2025-26, wearing apparel contracted by 5.3%,leather by 4.1%, while textiles...grew by just 1.2%. Other manufacturing collapsed by 14.9%, and food products grew by less than 1%...while labour-intensive, export-oriented sectors are stagnating or shrinking." m.economictimes.com/opinion/et-com…
English
7
28
73
5.2K
dickenson retweetledi
Rethik
Rethik@Rethik_D·
#UPDATE Details on BM-04
Rethik tweet mediaRethik tweet media
Français
10
56
342
41.3K
dickenson retweetledi
shreedhar singh
shreedhar singh@shreedharsingh9·
Kalyani Group signed an MoU with the Andhra Pradesh Government to establish a Gas Turbines & Gas Turbine Generators manufacturing facility in Coastal Andhra. The project will focus on next-generation power solutions for Data Centers and Defence,
shreedhar singh tweet media
English
2
25
120
1.3K
gautam
gautam@grayap9·
@unraveaero Is there an industrial boom currently happening?
English
1
0
8
637