Pranav kulkarni

342 posts

Pranav kulkarni banner
Pranav kulkarni

Pranav kulkarni

@Pranavkkk

Infrastructure, investments news/analysis . likes,Repost not endorsement

Maharashtra , India Katılım Mayıs 2020
87 Takip Edilen252 Takipçiler
Pranav kulkarni
Pranav kulkarni@Pranavkkk·
LATUR RING ROAD UPDATE NHAI has issued tender for Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of a New 4 lane Outer Ring Road around Latur City in the State of Maharashtra @cbdhage @AbhiPawarBJP
Pranav kulkarni tweet media
English
0
3
12
1.1K
Pranav kulkarni
Pranav kulkarni@Pranavkkk·
MSIDC has invited bids for CONSTRUCTION OF GOVERNMENT MEDICAL COLLEGE, 430 BEDDED HOSPITAL, GIRLS and BOYS HOSTEL 100 STUDENT CAPACITY AND RESIDENTIAL QUARTERS AT DHARASHIV DIST DHARASHIV Cost :- ₹ 285 crores @cbdhage @OmRajenimbalkr
Pranav kulkarni tweet media
English
0
3
11
876
Pranav kulkarni
Pranav kulkarni@Pranavkkk·
HADAPSAR - YEVAT NH 65 6 LANING AND ELEVATED CORRIDOR UPDATE THE TENDER HAS BEEN OPENED 4 companies have been qualified for technical evaluation 1. Montecarlo 2. Apco infra. 3. J kumar infra. 4. Welspun Ent. Financial bids will open soon @cbdhage x.com/i/status/19431…
Pranav kulkarni tweet media
Pranav kulkarni@Pranavkkk

MSIDC has invited bids for Upgradation of construction of six lane highway corridor from Ch. 8/500 to 33/500 and Upgradation of existing highway to six lanes from Ch. 8/500 to 40/00 Section At grade section of Hadapsar Yevat (NH65) in the state of Maharashtra Cost - 3146 crores

English
1
2
6
2.5K
Pranav kulkarni
Pranav kulkarni@Pranavkkk·
Talegaon - Chakan-Shikarpur 4/6 laning and elevated corridor Update The tender has been opened, 4 companies have been qualified for technical evaluation. 1. Apco infra. 2. Montecarlo 3. Ashoka buildcon 4. Welspun Ent. @cbdhage x.com/i/status/19431…
Pranav kulkarni tweet media
Pranav kulkarni@Pranavkkk

MSIDC has invited bids for Up-gradation existing 2 lane highway to 4 lane with construction of elevated 4 lane fly over at section Talegaon to Chakan from Ch. 0/00 to 28/300 and Up gradation of 6 lane highway Chakan to Shikrapur At grade from Ch.28/300 to 53/20 Cost- 3123 crores

English
1
3
15
4K
Pranav kulkarni retweetledi
The Maharashtra Index
The Maharashtra Index@TheMahaIndex·
Update on New Latur City Ring Road . Latur’s new 58 km Ring Road — passing through Chandeshwar, Kavha, Babhulgaon, Bhatkheda, Khulgapur, Nandgaon, Raiwadi, and Harangul — has now been officially granted the status of a State Highway! 🛣️✨ This major upgrade clears the path for wider roads, better infrastructure, and increased funding for development. Earlier, there was a demand to reroute the Ratnagiri–Nagpur National Highway through this new outer ring road, but it wasn’t approved. However, recognizing the growing traffic and importance of the route, the Maharashtra Government has now upgraded it to State Highway status. The 57.8 km stretch will connect: 📍 Latur–Ausa Road → Chandeshwar → Kavha → Katpur → Shirsi → Babhulgaon → Sonwati → Latur–Nanded Road → Bhatkheda → Kasarkheda → Khulgapur → Latur–Ambajogai Road → Nandgaon → Raiwadi → Harangul → Latur–Barshi Road. With this upgrade: ✅ Wider and safer roads are on the way ✅ Funding hurdles are removed ✅ Future traffic congestion will be significantly reduced
The Maharashtra Index tweet media
English
2
14
153
18.3K
Pranav kulkarni retweetledi
The Maharashtra Index
The Maharashtra Index@TheMahaIndex·
Latur Airport has been formally Transferred to @madc_official . Modernization of Airport is expected to Kick Start soon .
The Maharashtra Index tweet media
English
2
12
95
6.3K
Pranav kulkarni
Pranav kulkarni@Pranavkkk·
NHAI has invited bids for Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode Cost - Rs 3653 Crores
English
2
0
12
685
Pranav kulkarni
Pranav kulkarni@Pranavkkk·
NHAI has invited bids for Development of 8-Lane Elevated Flyover at Tier-1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg2 28.925 to km 42.113) section of NH60 in Maharashtra on (BOT) Mode.
Pranav kulkarni tweet media
English
2
1
28
1.3K
Pranav kulkarni
Pranav kulkarni@Pranavkkk·
NHAI has invited bids for Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg-1 12.190 to km 28.925) sec of NH60 in Maharashtra on BOT (Toll) Mode.
Pranav kulkarni tweet media
English
3
2
40
1.6K
Pranav kulkarni
Pranav kulkarni@Pranavkkk·
MSIDC has invited bids for Upgradation of construction of six lane highway corridor from Ch. 8/500 to 33/500 and Upgradation of existing highway to six lanes from Ch. 8/500 to 40/00 Section At grade section of Hadapsar Yevat (NH65) in the state of Maharashtra Cost - 3146 crores
Pranav kulkarni tweet media
English
1
8
46
4.9K