rdg engineering

626 posts

rdg engineering banner
rdg engineering

rdg engineering

@RDGEngineering

We are experts in scaffolding and temporary works design and are often called upon to design an array of solutions for public and private clients.

London, North West, North East, Glasgow Katılım Şubat 2013
144 Takip Edilen248 Takipçiler
rdg engineering
rdg engineering@RDGEngineering·
To support you in these challenging times, we are more than happy to help wherever possible. Whether you have a technical question, need advice on a design or would like to discuss best practice you can contact us at design@rdgengineering.co.uk #scaffolding #temporaryworks
rdg engineering tweet media
English
1
1
2
0
rdg engineering retweetledi
ICE North East
ICE North East@ICE_NE·
Some pics from a great recent lecture 'Engineered access solutions and associated risk' with David Milward from @RDGEngineering which highlighted the flexibility of scaffolding and the ingenuity of the (rdg) design teams. Watch the recording ice.org.uk/eventarchive/e…
ICE North East tweet mediaICE North East tweet mediaICE North East tweet mediaICE North East tweet media
English
0
1
3
0
rdg engineering
rdg engineering@RDGEngineering·
We had great feedback from the talk David Milward, our temporary works director, gave at the @ICE_engineers. David discussed the operational & site-based risks associated with TW design & changing industry mindset on the involvement of TW designers. #temporaryworks
rdg engineering tweet media
English
0
0
1
0
rdg engineering
rdg engineering@RDGEngineering·
With the initial results going against current knowledge & recommended practice, a full test plan is being developed to assess the performance characteristics of different combinations. Follow the discussion on our LinkedIn page to stay updated (3 of 3)
English
0
1
2
0
rdg engineering
rdg engineering@RDGEngineering·
An Initial test of 1 class B fitting with 3 class A supplementary check fittings resulted in a combined working check force of 25.5 kN. (Statistically Determines) (2 of 3)
English
1
1
1
0
rdg engineering
rdg engineering@RDGEngineering·
We have been involved in discussions around what makes a class B fitting have a higher working load slip capacity than a class A fitting. In the absence of any definitive conclusion, we have been conducting a series of tests. (1 of 3)
English
1
1
1
0
rdg engineering
rdg engineering@RDGEngineering·
An amazing project that integrates public access, revealing the process involved in a major regeneration scheme. RDG provided outline and preliminary scaffold designs. #WentUpWorthIt
Woodhead Group@WoodheadGroup

The fact file has landed! Take a look at what awaits you on the amazing @Wentworth_House public rooftop tours - open now.🏛️ Book your tour➡️ bit.ly/2T8gozT Project info➡️ bit.ly/WentworthScaff… #WentUpWorthIt @InsallArch @Lyndon_SGB @HistoricEngland @RDGEngineering

English
0
0
4
0
rdg engineering
rdg engineering@RDGEngineering·
Two of our engineers Rachel Joshua and Samantha Mikhail inspiring #STEM students from local schools. RDG provided an outline and preliminary design for the conservation works carried out at Wentworth Woodhouse.
Woodhead Group@WoodheadGroup

Fantastic morning showing girls from local schools what women can do in construction on the iconic #WentworthWoodhouse project, and sharing their personal stories of how they got into #STEM careers #loveconstruction #INWED19 #TransformTheFuture #WomenInSTEM

English
0
0
2
0
rdg engineering
rdg engineering@RDGEngineering·
The 130m x 75m multi-span duo-pitched temporary roof for the exhumation works at St. James’ Gardens, London Euston, designed by RDG.
rdg engineering tweet media
English
0
1
4
0
rdg engineering
rdg engineering@RDGEngineering·
Tube and fitting design providing access for maintenance works at a power station based on Wilton International, Teesside. The scaffolding is ground founded, with the upper section based off the steelwork supporting the vessel with minimal tie locations.
rdg engineering tweet media
English
0
1
5
0
rdg engineering
rdg engineering@RDGEngineering·
We had great feedback from the HS2 temporary encapsulation talk last night at IStructE
rdg engineering tweet media
English
1
0
3
0
rdg engineering
rdg engineering@RDGEngineering·
RDG designed a 130m x 75m multi-span duo-pitch temporary roof for exhumation works at HS2, London Euston. Our MD Ray Gold and engineer Pooja Shah will be discussing the design on 27th March at the IStructE HQ. Tickets are free and are available at eventbrite.co.uk/e/project-focu…
English
0
0
2
0
rdg engineering
rdg engineering@RDGEngineering·
Our team in Glasgow provided a design and build for remedial works of Kingston Bridge. The design consisted of an access scaffold and cantilevered bridged deck along the bridge parapet edge. Vehicular access was maintained throughout the duration of the works.
rdg engineering tweet media
English
0
0
2
0
rdg engineering
rdg engineering@RDGEngineering·
Hoarding designed by RDG for London Underground, transformed into a canvas for Linder Sterling as part of the Art in the Underground project. The design consisted of 3.6m high steel posts anchored into concrete kentledge using resin anchor fixings. ow.ly/gkyR30niOHW
English
0
0
2
0