STD Bijbehara (KPDCL)

97 posts

STD Bijbehara (KPDCL)

STD Bijbehara (KPDCL)

@SKpdcl

Ex Engg STD Bijbehara

Hamzapora Bijbehara,J & K Katılım Ekim 2020
55 Takip Edilen778 Takipçiler
pirzada hidayatullah
pirzada hidayatullah@pirzadahidayat·
If there has been any issue of prime importance for us as JKEEGA ,it has been Recruitment of Junior Engineers in Various Power Corporations.we assure Aspirants to prepare hard as there will be no further impediments & this will be prioritized and followed further . Good luck
pirzada hidayatullah tweet media
English
3
19
39
2.4K
STD Bijbehara (KPDCL)
STD Bijbehara (KPDCL)@SKpdcl·
KPDCL ESD Pampore urges it's domestic consumers to take advantage of Amnesty scheme and settle ur bills. This scheme is upto 31st march only
English
0
0
0
220
STD Bijbehara (KPDCL) retweetledi
Kashmir Power Distribution Corporation Limited
📢IMPORTANT UPDATE! This is for the information of the general public that due to a drastic reduction in power generation resulting in reduced availability of power, KPDCL shall be forced to temporarily increase the curtailment by 2 to 2.5 hours across Kashmir Valley during peak hours. The temporary increase shall be reversed as soon as sufficient power is available. The inconvenience caused is deeply regretted. @diprjk @OfficeOfLGJandK @Raj576113 @mussarat_zia
Kashmir Power Distribution Corporation Limited tweet media
English
54
75
70
22.6K
STD Bijbehara (KPDCL) retweetledi
Mussarat Zia
Mussarat Zia@mussarat_zia·
Pics 1-2: 10MVA Recvg Stn at Tailbal, Sgr. Pics 3-4: 2X10MVA RS at Gassi, Batpora. Target: Make these CAPEX RSs operational by Dec-end. Consumers frm Syedpora Hamchi, Faiz Colony sourced thru Fdr-4 RS Zakoora wl benefit. @diprjk @OfficeOfLGJandK @Raj576113 @KPDCLOfficial
Mussarat Zia tweet mediaMussarat Zia tweet mediaMussarat Zia tweet mediaMussarat Zia tweet media
English
8
34
130
12.7K
STD Bijbehara (KPDCL) retweetledi
AEE STD SD SARNAL (KPDCL)
AEE STD SD SARNAL (KPDCL)@AeeStd_SdSarnal·
Shutdown was availed on 33 kV Shamsipora tap line to carry out excavation for preparation of trench for U/G cabling alongside emergency landing facility on NH-44. Line has been charged back after completion of day's work
AEE STD SD SARNAL (KPDCL) tweet mediaAEE STD SD SARNAL (KPDCL) tweet media
English
0
2
3
1.1K
STD Bijbehara (KPDCL) retweetledi
AEE STD SD SARNAL (KPDCL)
AEE STD SD SARNAL (KPDCL)@AeeStd_SdSarnal·
The 11 Mtr ST pole at Bijbehara road crossing near Rstn Sangam having low horizontal and vertical clearance from the Double circuit 11 kV Line and road cross replaced by 13 mtr long ST pole for safe clearance and stabilisation of 33 kV Sangam line
AEE STD SD SARNAL (KPDCL) tweet media
AEE STD SD SARNAL (KPDCL)@AeeStd_SdSarnal

Utilized the shutdown of GSS Awantipora for shifting of conductor from Undersize PCC poles to 11 mtr ST pole at Tulkan road cross on 33 kV Sangam ist line

English
0
2
3
759
STD Bijbehara (KPDCL)
STD Bijbehara (KPDCL)@SKpdcl·
Due to heavy wind storms & rains in distt. Anantnag & kulgam most of the 33kv lines came under fault, power supply in these areas got affected.Restoration of faulty lines going on
STD Bijbehara (KPDCL) tweet mediaSTD Bijbehara (KPDCL) tweet mediaSTD Bijbehara (KPDCL) tweet media
English
0
1
8
1K
Aadil
Aadil@rather_aadil·
We r in th last week of Aprl, but still RS NILLOW(Village chanser) @ed_kulgam is providing us winter power schedule ( 2hr supply 2hr break) We r paying 920/month vch was 560/month last year ,increse in Fee but th time duration n voltage of power hs decreasd. @KPDCLOfficial
Kulgam, Jammu & Kashmir 🇮🇳 English
1
0
4
330
STD Bijbehara (KPDCL)
STD Bijbehara (KPDCL)@SKpdcl·
@rather_aadil @yasinc_ias @pddjkofficial In response to the grievence lodged by Mr Adil Rather R/O Cheensar regarding power schedule at receiving Station Nillow. In this regard it is to submit that the receiving station Nillow of total capacity 16.3MVA has four out going 11kv feeders.
English
0
0
0
64