Vist

131 posts

Vist

Vist

@Vist_356

Katılım Kasım 2021
62 Takip Edilen1 Takipçiler
Vist
Vist@Vist_356·
@MonOno @Schlankgirl @kleeposting ur pfp is a guy looking at mcdonalds have u tried eating a salad and not going against someones freedom of speach?
English
0
0
1
207
Candy
Candy@Schlankgirl·
@kleeposting Youre being purposefully dense obviously this is abt losing weight
English
4
0
191
9K
Vist
Vist@Vist_356·
@z__balo Оце дійсно як цивілізовані люди повинні вирішувати такі питання, дякую за вашу працю!(мені самому ліньки)
Українська
2
0
3
421
Vist
Vist@Vist_356·
@Leanira ну так дозволяєж по фактам гнобити, знайте різницю!
Українська
0
0
4
410
аватара Еріди
Я все ще хуїю з цього шматка, який буквально дозволяє гнобити лбдей за зовнішність
аватара Еріди tweet media
Українська
11
52
472
11.9K
Vist
Vist@Vist_356·
@Isurugi_Fox @AnonZzz29670 yes i understand, just potential of jufu being both in under appreciated an least favourite was kinda sus to me so i decided to ask, and thanks for the reply👍
English
1
0
1
33
ZZZAnonPhaethon
ZZZAnonPhaethon@AnonZzz29670·
“What do yall think of this list (i could’ve switched out cissia, caesar or jufufu for underated but either of them work)"
ZZZAnonPhaethon tweet media
English
5
3
63
2.3K
Vist
Vist@Vist_356·
“I don’t like arguing with you — not because I think you’re right, but because you never think you’re wrong.” i would ask is it fire or nah, but have literally 0 folloewrs
English
0
0
0
74
Vist
Vist@Vist_356·
@OnlyWaifu listen man i understand that 98% of hate towards you are just retards that are afraid of evil red guy who dares to interrupt their 3v1 boss fight, but the 2% that brings you down imo is 100% confidence in ur actions, not because you are right but because you never think you wrong
English
0
0
0
72
OnlyWaifu 🇦🇷
OnlyWaifu 🇦🇷@OnlyWaifu·
I love finding these on my profile after an Elden Ring invasions session
OnlyWaifu 🇦🇷 tweet media
English
10
6
326
8.2K
Vist
Vist@Vist_356·
@Drazon333 It starts as a ragebait and changes to the truth nuke halfway through, how do you call a post like this?
English
0
0
1
576
LordOfBlasphemy 𖤐
LordOfBlasphemy 𖤐@Drazon333·
DS1 has the best late game DS2 has the least amount of jank DS3 has the best level design BB has the best boss roster Sekiro has the best ost ER has the least replayability NR has the best lore
English
154
51
2.5K
279.3K
⛧
@luxnoira·
legendary gif find
GIF
English
45
647
12.3K
238.8K
Vist
Vist@Vist_356·
smart people dont think they smart they just are, and dumb people dont think they dumb they just are
English
0
0
0
135
Vist
Vist@Vist_356·
@bluwunk Women who dont instamute should shout slurs back, then everyone will ask for duo after game
English
0
0
0
67
bluwunk
bluwunk@bluwunk·
would u look at that prime examples to why women don’t want to vc!!
bluwunk@bluwunk

@LeagueOfLeaks cant wait for the weird mean sexist comments in vc!!!

English
49
16
596
36.3K
Vist
Vist@Vist_356·
Events wich you do not expect tend to catch you off guard.
English
0
0
0
150
Vist
Vist@Vist_356·
@WolvGamin Worst economy since its a PART of non-existent resource management
English
0
0
1
24
Creature of Prypiat
Creature of Prypiat@WolvGamin·
CoP •Pros: Best sidequests, best gunplay, best economy, freeplay •Cons: Non-existent resource management.
English
5
0
13
431
Creature of Prypiat
Creature of Prypiat@WolvGamin·
Pros and Cons of every STALKER game: SoC •Pros: Best storyline & atmosphere •Cons: Very linear CS •Pros: Most complex a-life, best graphics, best combat music, OP artifacts •Cons: Plot holes, hemophilia, grenade spam.
English
4
0
31
1.2K