Our plant in Boden will produce millions of tonnes of green steel per year, but how will we get all the materials in and out of the plant?
Adjacent to our own plant construction project, Polar Structure and Boden Municipality are building an infrastructure corridor, featuring a new railway, road, and pedestrian and bike path, which will be used to transport material to and from the factory. Most of it will be transported by rail, meaning we are also constructing a large rail yard at the site. So how big will it be?
– More than 11km of tracks
– 18 grinding switches
– 196 catenary poles
– More than 8km of power cables