Eskom Hld SOC Ltd
Eskom Hld SOC Ltd@Eskom_SA·
#EskomGauteng #SandtonOutage #StatusUpdate Electricity supply is restored to Benmore, parts of Eastgate, Morningside, parts of Sandown, Sandton Central and Wierda Valley. Technicians are still working on repairs and restoring supply to the remaining customers in Eastgate and Sandown. We will continue providing updates as we proceed on site. We apologise for the inconvenience caused.
English
19
1
5
5.3K
Johannesburg Water
Johannesburg Water@JHBWater·
Daily water supply system status updates: Tuesday, 16 September 2025 (Morning) ^N
Johannesburg Water tweet media
English
14
0
1
3.1K
Amy B
Amy B@amy_bee13·
@JHBWater @CityofJoburgZA literally watched COJ truck come fill their water bottles and leave. No water in this street now. Stella St, Sandown.
English
1
0
1
137
@CityPowerJhb
@CityPowerJhb@CityPowerJhb·
#CityPowerUpdates #CityPowerOutages #InnerCitySDC Braamfontein Substation: Operators are currently on-site and actively addressing a power disruption from Juta Street distributor. This disruption impacts customers in Braamfontein, specifically Melle, De Korte, Biccard, Bertha, Jorissen, Eendracht, Juta, Yale Road, Simmonds, Smit, and the surrounding streets. Additionally, the team will rectify phasing issues that some customers are experiencing. Once the investigation has concluded, an estimated time of restoration (ETR) will be provided. We sincerely apologise for the inconvenience caused to our affected customers. For ongoing updates, please subscribe to our Inner City SDC WhatsApp channel using the following link: whatsapp.com/channel/0029Va…. ^NM
@CityPowerJhb tweet media
English
1
0
0
2K
Amy B
Amy B@amy_bee13·
@JHBWater Why is there no water in Sandown again?
English
0
1
5
465
Amy B
Amy B@amy_bee13·
@JHBWater About 4h now. Theres a very small trickle of water from cold taps, but nothing from hot taps.
English
0
0
0
74
Johannesburg Water
Johannesburg Water@JHBWater·
Daily water supply system status updates: Wednesday, 16 July 2025 (Afternoon) ^N
Johannesburg Water tweet mediaJohannesburg Water tweet mediaJohannesburg Water tweet media
English
18
0
5
5.6K
Amy B
Amy B@amy_bee13·
@JHBWater Please just open the water now.
English
0
0
1
107
Amy B
Amy B@amy_bee13·
@JHBWater is there any update on the water in Sandton?
English
1
0
0
41
Amy B
Amy B@amy_bee13·
@Eskom_SA please sort Lonehill power out. The power has been off since 11am and was on now for 30min before off again. Can’t log a new fault. Ref no: 736382147
English
0
1
3
262
Amy B
Amy B@amy_bee13·
@CityPowerJhb Why is Lonehill out when we are part of Load Limiting?
English
0
0
0
208
Amy B
Amy B@amy_bee13·
@CityPowerJhb Why is Lonehill out when we are part of Load Limiting?
English
0
0
0
209
@CityPowerJhb
@CityPowerJhb@CityPowerJhb·
#CityPowerUpdates #Alexandra Alexandra Substation Far East Bank Standby Distributor tripped post loadshedding due to overloading affecting Ext:7, 8, Lombardy East and the surrounding . Our operators are onsite monitoring the load. Customers are urged to switch off non essential appliances for the load to stabilise. More information will be provided as soon as it is available. We apologize for the inconvenience caused. ^NT
English
68
0
2
18.2K
Amy B
Amy B@amy_bee13·
@CityPowerJhb @Eskom_SA Lonehill, JHB currently no power. We are not meant to be load shed as we are on the load limiting/reduction pilot.
English
0
1
1
175
Amy B
Amy B@amy_bee13·
@CityPowerJhb Does this involve Lonehill? We don’t have power now (off since 12:20) and our area is meant to be on load reduction (so we shouldn’t be getting load shed right now)? @CityPowerJhb @Eskom_SA
English
0
0
0
323
@CityPowerJhb
@CityPowerJhb@CityPowerJhb·
#JoburgUpdates #CityPowerUpdates #Randburg Northriding substation Precession distributor tripped. Operators are currently running a fault. Further details will be confirmed in later updates. We apologise for the inconvenience caused.^GR
English
17
0
1
8.6K
Amy B
Amy B@amy_bee13·
@CityPowerJhb @CityPowerJhb Block 4 Mill Hill is still off from loadshedding. It’s been off for the scheduled 4.5 hours and counting now.
English
0
1
3
374
@CityPowerJhb
@CityPowerJhb@CityPowerJhb·
#Stage 5 in progress. Due to the impact of loadshedding Stage 5, some of the Blocks will be shed for 4hrs. These are: 08:00 - 12:30 Block 1 10:00 - 14:30 Block 2 12:00 - 16:30 Block 3 14:00 - 18:30 Block 4 16:00 - 20:30 Block 5 18:00 - 22:30 Block 6 20:00 - 00:30 Block 7^LP
@CityPowerJhb tweet media
English
252
15
44
106.7K
Amy B
Amy B@amy_bee13·
@CityPowerJhb No power still in block 4 Mill Hill since loadshedding ended at 18:30
English
0
0
0
0
@CityPowerJhb
@CityPowerJhb@CityPowerJhb·
#LoadsheddingUp[dates Stage 5 loadshedding in progress, blocks 14,2,6,10 & 13 affected from 20h00 until 22h30. Please note that certain blocks will experience 4 hours of load shedding instead of two during Stage 5 and 6.^LP
@CityPowerJhb tweet media@CityPowerJhb tweet media@CityPowerJhb tweet media@CityPowerJhb tweet media
English
148
4
13
0
@CityPowerJhb
@CityPowerJhb@CityPowerJhb·
#Loadshedding is still in progress Blocks 12, 16, 4, 8 and 11 to be affected from 16h00 until 18h30. ^NT
@CityPowerJhb tweet media@CityPowerJhb tweet media@CityPowerJhb tweet media@CityPowerJhb tweet media
English
136
1
13
0
Vuma
Vuma@vumatel·
@amy_bee13 Hi Amy B, kindly note that your ticket is linked to a network outage. The team is still busy with the repairs.
English
1
0
0
0
Amy B
Amy B@amy_bee13·
@vumatel please can I have an update on ISP-816031
English
1
0
0
0