
Avi Zevin
214 posts

Avi Zevin
@azevin
#energytwitter enthusiast. personal views etc etc.



It apparently strikes a chord--and a coordinated response--when you point out that people who are paid by BigTech to shill for data centers are not reliably neutral on questions central to the AI data center build out.





We at @nrgenergy are big fans of the @ENERGY proposal that could create a more standardized, efficient process to connect large loads to the grid. Today we propose some concrete ideas to make sure it works as intended. 🧵

This is the paradox of "accountability" in government: Policymakers become so obsessed with mitigating oversight/litigation risk, they ignore the ultimate risk of not actually getting anything done.








This notice from DOE directs the FERC to create standardized, fast, and non-discriminatory interconnection procedures for large loads exceeding 20 MW, particularly data centers and AI facilities. It expands FERC’s jurisdiction to large loads (not just generation), and proposes requiring the same kind of deposits, standards, and readiness to curtail or dispatch for flexible loads. It emphasizes studying “hybrid facilities” where large loads share interconnections with generation to minimize grid upgrades and expedite approvals. BESS co-located with data centers would appear to qualify as hybrid, dispatchable facilities, eligible for accelerated interconnection (possibly <= 60 days with streamlined studies) and reduced upgrade costs. The caveat is that hybrid operators must accept curtailment controls, and fund necessary network upgrades.

Major development🚨🚨 @ENERGY directs @FERC to consider an Advanced Notice of Proposed Rulemaking on large load interconnection. THREAD highlighting noteworthy paragraphs:



