Paces

268 posts

Paces banner
Paces

Paces

@paces_ai

Agentic AI for power projects and AI infrastructure.

New York, NY Katılım Ekim 2021
12 Takip Edilen585 Takipçiler
Paces
Paces@paces_ai·
Federal environmental reviews average years, not months. CEQ's Permitting Innovators Expo is looking for tech that can close that gap. Paces is excited to have been selected to showcase. Read the announcment: hubs.la/Q04p69BP0
Paces tweet media
English
0
0
0
105
Paces
Paces@paces_ai·
KKR just paid $4.2B for EDF Power Solutions' North American portfolio. EDF saw that shift early: they used Paces to screen 90+ development sites for co-location and turn them into a ranked pipeline in weeks. Here's how: hubs.la/Q04nVB2P0
Paces tweet media
English
0
0
0
89
Paces
Paces@paces_ai·
We asked energy developers if they're using AI. 45% have started. 45% haven't. Only 9% call themselves AI native. The industry is split right down the middle. Watch the webinar on demand: hubs.la/Q04npjyt0
Paces tweet media
English
0
0
0
38
Paces
Paces@paces_ai·
Today at 3 PM ET. One wrong AI call in energy development can cost millions. So we're showing where AI speeds you up, where it doesn't, and how to tell the difference, live on a real project. Register → hubs.la/Q04n3g4l0
Paces tweet media
English
0
0
0
39
Paces
Paces@paces_ai·
One day left. Tomorrow at 3 PM ET we hand over the playbook for using AI in energy development: where it belongs, where human judgment still wins, and how to validate an output before it moves a project. Register → hubs.la/Q04mZGlT0
Paces tweet media
English
0
0
0
22
Paces
Paces@paces_ai·
A developer using AI screens 1,000 sites in the time your team screens 10. Your competitors are already building that head start, and it compounds every week. Learn how to catch up on June 30 with our webinar. Register here: hubs.la/Q04mvqyS0
Paces tweet media
English
0
0
0
66
Paces
Paces@paces_ai·
Energy & utilities have one of the lowest AI adoption rates of any major industry: 13.6%. Not because teams don't want AI, but because they don't know where to start. @kyle__cb wrote the AI guide for developers.
Paces tweet media
English
1
0
1
66
Paces
Paces@paces_ai·
Data center developers are winning or losing on speed to interconnection. A site that looks grid-ready can have 3 years of queue in front of it. AI can surface those risks in hours instead of weeks. Join the webinar to learn how: hubs.la/Q04m9xpl0
Paces tweet media
English
1
0
0
795
Paces
Paces@paces_ai·
The utility said 400 MW. A Paces Power Flow Study showed ~150 MW. This developer walked away from the site and was relieved he did. A Power Flow Study is the cheapest diligence you can run before committing capital. Link to the full story: hubs.la/Q04lxq-w0
Paces tweet media
English
0
0
0
79
Paces
Paces@paces_ai·
Only 32% of the renewable energy industry is satisfied with their progress on AI (BCG). The top developers are already pulling ahead with AI workflows. We're hosting a webinar on the use cases that actually work in energy development. Register now: hubs.la/Q04lq09l0
Paces tweet media
English
0
0
0
65
Paces
Paces@paces_ai·
A federal court just restored the 5% safe harbor for wind and solar, 27 days before the July 4 deadline. That, Blue Owl's ~$975M data center recap, Primergy's $760M Gemini refi, and what 4.2% inflation means for power. Stu breaks all of this down in the new Power Weekly.
English
0
0
0
100
Paces
Paces@paces_ai·
AI can screen thousands of sites in minutes. That only helps if you can trust the results. Join us for a free webinar June 30 on where AI belongs in development and how to validate its outputs: hubs.la/Q04kTxW30
Paces tweet media
English
0
0
0
33
Paces
Paces@paces_ai·
That's why we built Engagement Strategy add-ons for our Local Stakeholder Mapping and Community Sentiment modules — a per-jurisdiction plan for who to approach, what to offer, and what to say. From intel to action.
English
0
0
0
37
Paces
Paces@paces_ai·
20 canceled data center projects in Q1 2026. 71% of Americans oppose new construction. Renewables support split along party lines. Developers who can't navigate local opposition aren't building.
Paces tweet mediaPaces tweet media
English
2
0
1
84
Paces
Paces@paces_ai·
1,400 GW of clean energy is waiting to connect to the US grid. Fewer than 20% of those projects will succeed. The resolution? Knowing early enough whether your site can actually interconnect with pre-development: hubs.la/Q04kwgfN0
Paces tweet media
English
0
1
0
175
Paces
Paces@paces_ai·
A utility said 400 MW available. A Paces Power Flow Study confirmed 150 MW and stopped a firm from committing $750,000 to the next phase of their interconnection study. Read the case study: hubs.la/Q04jVDlX0
Paces tweet media
English
0
0
0
76
Paces
Paces@paces_ai·
After all the changes in energy last year, five-year plans no longer exist. Engie's Navya Gundeti on how distributed developers are navigating it, and the day utilities start telling developers where to build. Full episode: hubs.la/Q04hjyM60
English
0
0
0
77
Paces
Paces@paces_ai·
Building AI for energy development is mostly a question of trust. Where can the model run on its own, and where does a human need to sign off? @kyle__cb on how we think about that line, and what it means for Paces Agent: hubs.la/Q04h6xXk0
Paces tweet media
English
0
0
2
82
Paces
Paces@paces_ai·
Power development can't move at grid speed when human workflows are the bottleneck. Paces Agent runs end-to-end development workflows. Already on 3.2+ GW of pipeline. 5x more sites. Half the time to shovel-ready: hubs.la/Q04gBWnV0
English
0
0
10
6K