
Stefano
5.8K posts

Stefano
@sbiefeni
🇨🇦 🇮🇹 🇺🇸 🇮🇷 Software engineer, vibe coder, stock trader and investor, provoke, untangle tech, stack wealth, spark truth.





Happy 8 April (Wednesday) at Giga Texas, especially for those wanting an update on Cybercabs … I saw about 60 of them in two groups in the outbound lot today … the largest grouping yet! Also, looks like at least some of these have white seats and most still have clearly visible steering wheels … I will let you conclude what you wish from that, but these still do not look like the final “production” versions, so perhaps they are testing out some of the new features while testing some of the @robotaxi areas around the country.











Battery Line 2 has successfully completed Factory Acceptance Testing (FAT), validating system performance under real operating conditions ahead of installation! This milestone reflects the disciplined, process-driven execution required to scale advanced manufacturing. Line 2 is purpose-built to expand overall production capacity and incorporates key enhancements, including a single-piece flow configuration, increased process redundancy, and advanced pick-and-place gantry systems to drive faster cycle times and improved efficiency. These design improvements, along with the Thorn Hill building layout, are expected to translate into meaningful gains: 1. Raw material travel reduced from approximately 2.09 miles to 0.29 miles —86% reduction 2. Line length reduced from approximately 478 ft (Line 1) to 288 ft (Line 2) — 40% reduction Next stop: installation at the Eos Thorn Hill facility.

















