
@GNRailUK so loads of CBG trains cancelled because of signal failure. Unavoidable. However, the 18.33 FPK to HIT is cancelled due to a shortage of train crew. Surely one of the drivers from the cancelled trains due to signal failure could’ve driven that train to Cambridge.
English













