
New documents unearthed by GMB indicate that between 89 and 148 roles are expected to be lost at the plant around 31 March 2027.
The cuts could represent more than 30% of the site’s 465-strong workforce
bioenergy-news.com/news/drax-conf…
English
Bioenergy Insight
6.1K posts

@BioenergyInfo
The leading magazine for the biomass, biogas and biopower sector.



















