Branch
6.3K posts

Branch
@BranchM
dev @dexteraisol | branchm.sol
Miami, FL เข้าร่วม Mayıs 2024
1.1K กำลังติดตาม2.7K ผู้ติดตาม
Branch รีทวีตแล้ว

Throw away your bracket.
March Madness lives on Solana 🏀
Chose any team, ride them to the Championship on @bigdance_fun
Big Dance@bigdance_fun
Introducing BigDance[Fun] Pick your teams, own their tokens, and win big when they advance. Be early to a team for more rewards 👇
English
Branch รีทวีตแล้ว

@SolanaFloor @toly @gakonst @tempo @solana -C̶o̶m̶i̶n̶g̶ ̶s̶o̶o̶n̶-
Here today. Built to fill the holes of the solana-mpp-sdk
Dexter AI@dexteraisol
Introducing Simple Solana Settlement on MPP, the easiest way to accept stablecoin payments on Solana via the new Machine Payments Protocol. MPP is great for fiat, but it treats on-chain settlement as a second-class option. Enter: a managed Solana settlement service for the Machine Payments Protocol. npm i @dexterai/mpp
Español
Branch รีทวีตแล้ว

Introducing Simple Solana Settlement on MPP, the easiest way to accept stablecoin payments on Solana via the new Machine Payments Protocol.
MPP is great for fiat, but it treats on-chain settlement as a second-class option. Enter: a managed Solana settlement service for the Machine Payments Protocol.
npm i @dexterai/mpp

English

🔴 Bundler's holdings: 32.2% $Dexter @dexteraisol
The bundle is selling now, don't give them the exit liquidity they need.
Just let them capitulate, the current liquidity pool is barely $65k. It definitely doesn't reward their effort so far. But if you keep buying after each dump, the exit liquidity would be 2-3x higher.
$dexter's bundle is very similar to $radr, a project that rugged few weeks ago.
Those fraudsters are manipulating the numbers, all is made up, nothing is really true.

English

@skybridgeweb3 @0xBatur @dexteraisol Same BS screenshot every time makes you look like a dumb retard
English

@BranchM You're about to see those numbers. Just wait and see.
Nice to stop selling a bit and checking your X account, right?
English

good for fiat, not good for stables
mpp seems good for fiat payments
but a merchant waiting minutes for a stablecoin payment to confirm is crazy work

Stripe@stripe
English

@_rishinsharma @solana Mpp’s goal is to replace solana with tempo in that sentence. The trojan horse is in the gates
English

Our goal is for @solana to be a cheap, fast payment rail for agentic use cases universally
it doesn't matter which standard is being used.
what makes solana great is the apps, developers, users, and ecosystem. excited to see what they do with MPP
Georgios Konstantopoulos@gakonst
MPP soon on @solana! github.com/solana-foundat…
English

Stripe just launched their second attempt at payments, Stellar being their first years ago and the minimum cost of a transaction is $0.01 USDC and 1.5%.
Solana will cream this here on rent reductions and p-token, the direct by Solana is the right one, lower fees drastically, increase volume.

Stripe@stripe
English

@harpaljadeja It also had no competition for your nickel since it has only a very small selection (a couple hundred endpoints) from a walled garden
English

@BobSummerwill They’re already choosing winners and losers, a new record for a day 1 chain
English

Corpo-chains for the win.
"permissionless and open" seemingly means whitelisted validators and you can call our hosted API endpoints
donnoh.eth 💗@donnoh_eth
English
Branch รีทวีตแล้ว

not really bro it's just a payment channel contract, we've known how to do this for so many years in general purpose evm chains :D
the tempo transactions just make it easy to work w/o the facilitator which is a pretty annoying component in the x402 architecture which even tho is theoretically optional it's kind of impossible to use w/o the CDP one
English
Branch รีทวีตแล้ว

Branch รีทวีตแล้ว











