FLFunYo
3.8K posts

FLFunYo
@FLFunYo
Florida resident. Not a member of the Freedumb Florida Man coalition. Username is meant to be ironic. I laugh when MAGA calls me "bro".
شامل ہوئے Haziran 2025
295 فالونگ12 فالوورز

I welcome the Supreme Court's correct decision. The left has spent decades hiding their racial obsession behind the banner of civil rights. Today, that game ends.
Racial gerrymandering is not protection. It is the left's plantation politics repackaged with a law degree. The condescending assumption that Black Americans cannot compete without bureaucrats drawing lines around them is not compassion. It is racism with different branding. I am a Black man who has never needed the government to predetermine my outcome. Neither do the voters of this country.
The left claims to champion equality while demanding the government sort every American into a racial box. That is not a civil rights movement. That is a power grab dressed up as one. We cannot become a more perfect union if Democrats continue to treat race as a weapon and black voters as a captive constituency to be managed and mobilized.
Everyone who is a citizen of this great country should first and foremost be an AMERICAN. Regardless of race, religion, zip code, or income, we are all Americans and should be treated as such. The left has never believed that. Today's ruling says they no longer get to act like it.
English

Dear Orlando Sentinel:
1. You’re right. I have “never been an African-American woman.”
2. Every DEI program puts Black women at the front of the line and White men at the back with zero regard for either person’s skills.
As Governor, I’ll end anti-White racism.
Team Fishback@TeamFishback
Orlando Sentinel: James Fishback is "out of touch" for saying that "white men are the biggest victims of racism."
English

@KDouglasNH @CYRs You literally did not start with any counterpoint. This was your initial reply to my post. Trolling.
Go troll elsewhere with your scattered thought process.

English

@KDouglasNH @CYRs Kyle, you continually make public posts stating that Jeffrey Epstein was not a pedophile. He was, and your posts will definitely be perceived as you being a pedophile defender. Again, your choice.
English

@j_fishback Asks for a source of information.
(Source provided.)
Makes juvenile comment, blocks and runs away.
This is #MAGA

English

@j_fishback "Every DEI program puts Black women at the front of the line and White men at the back with zero regard for either person’s skills."

English

@stackingloaf @CYRs "Decades of environmental violations are okay because I think Donald Trump is good at economics."
"You're mixing up my worlds"
I believe they were mixed up from the beginning. Again, not wasting another moment on your absolutely illogical comparisons.
English

@stackingloaf @CYRs As they should. This doesn't explain away the intent to violate spanning decades for one of those buildings.
Again, I get it. You feel that you need to defend billionaire Trump, to the point of defending blatant environmental violations. It's quite fascinating, really.
English

@stackingloaf @CYRs An illogical counterpoint.
"Decades of environmental violations are okay because I think Donald Trump is good at economics."
I'm not wasting another minute on this nonsense.
GIF
English

@stackingloaf @CYRs First you blamed it on "old buildings". Now your using pretzel logic to ignore the decades of violations, beginning at the construction phase, and pivoting to "Trump knew what he was doing considering his economics". 😂😂🥨
English

@FLFunYo @CYRs Sure there were still violations but I am going to assume that Trump knew what he was doing considering his economics are factually better than Democrats on paper either way. These are topics typical people wouldn't even understand.
FLFunYo@FLFunYo
English

@KDouglasNH @CYRs Kyle, you have your name, city and state you live in, and a link to your "freelance" work. That's your decision to share that information. However, your posts are public and viewable to people across the globe. That includes violent, mentally ill people. That's why I stay anon.
English

@KDouglasNH @CYRs Kyle, you say this over and over again to people on X. You troll accounts, then whine about not being given a fair opportunity to engage in meaningful debates. Change your conversation tactics. Begin with counterarguments, not insults. 👍
English

@BowTiedRacer @Stugry108 @j_fishback The typical response. When presented with a counterpoint that threatens your belief system, you lash out like an insolent child to protect your cognitive dissonance. I get it. 👍
English

@TheSVAF @BowTiedRacer @Stugry108 @j_fishback Graph #1
Let's look at causation, shall we? Systemic oppression drives up crime rates. Here's a summarization for you to use to begin your own research on the subject.

English

@FLFunYo @BowTiedRacer @Stugry108 @j_fishback Black *women* commit murders at a rate higher than White *men*. They are also a standard deviation dumber. Cope.


English

@TheSVAF @BowTiedRacer @Stugry108 @j_fishback Graph #2 (IQ) reinforces what I explained to you on your other comment. Socioeconomic disparities in education.
x.com/FLFunYo/status…
FLFunYo@FLFunYo
@TheSVAF @j_fishback You're talking to a data analyst, champ. Sure, you can write a query that results in a dataset that reinforces your "viewpoint". That same dataset does not reflect the socioeconomic disparities based on race in higher education.
English

@TheSVAF @j_fishback You're talking to a data analyst, champ.
Sure, you can write a query that results in a dataset that reinforces your "viewpoint". That same dataset does not reflect the socioeconomic disparities based on race in higher education.
English

@FLFunYo @j_fishback Why are you against statistics? Is math hurting your feelings? Blacks overall are net-negatives on society financially, Whites overall are the opposite. It’s not hard to grasp.
English

@BowTiedRacer @Stugry108 @j_fishback As expected, you've chosen not to expand your knowledge on a subject you very clearly do not understand.
Your racism is the result of your own ignorance.
English

@FLFunYo @Stugry108 @j_fishback STFU Retard
What I said is based in Centuries of provable and repeatable data.
Your insults mean nothing to me, I’ve seen what you cheer for
English





