BOLT EVM

827 posts

BOLT EVM banner
BOLT EVM

BOLT EVM

@BOLTVR

⚡an Open Headless Dancefloor. a Nexus Hub for Galas and Events on the Ethereum Virtual Machine⚡ https://t.co/qF3QYDbSsR

BOLTEVM Katılım Mart 2022
94 Takip Edilen345 Takipçiler
BOLT EVM
BOLT EVM@BOLTVR·
🎮 The future of digital gaming isn't cloud streaming or revokable licenses. It’s Phygital Media. Introducing BEAM — an EVM Games Marketplace & 3D Hardware Storefront built on @Monad_XYZ. Watch the full demo 👇
English
3
0
2
148
BOLT EVM
BOLT EVM@BOLTVR·
4️⃣ 1-Click EVM Multichain: GM Console capable of deploying marketplace proxy stacks across any RPC endpoint in second
English
0
0
0
6
BOLT EVM
BOLT EVM@BOLTVR·
Why the future of games is PHYSICAL MEDIA: 1️⃣ True Sovereignty: You don't just own a database entry — you own 3D-printable GCode assets, cryptographic NFC hardware tags, and ERC-1155 licenses on-chain.
English
3
0
1
14
BOLT EVM
BOLT EVM@BOLTVR·
3️⃣ Developer Royalties: Built-in EIP-2981 royalties giving creators perpetual earnings on secondary markets.
English
0
0
0
1
BOLT EVM
BOLT EVM@BOLTVR·
2️⃣ On-Chain Quality Gates: Integrated "The Guards" anti-cheat & automated 85-point quality scores (GV-08) directly in Solidity.
English
0
0
1
12
BOLT EVM retweetledi
Treegens
Treegens@treegens·
GM / GN Treegens 🌳 We’re coming together to spread some love to our brothers & sisters affected by the earthquake in Venezuela 🇻🇪 Ft: 💚Live Music 💚Alpha 💚Prizes ⬇️SET REMINDER⬇️ x.com/i/spaces/1XGyg…
English
7
14
30
1.2K
BOLT EVM retweetledi
joseacabrerav.tgn | Cyborg Amish Balance
🌱 Venezuela needs us. Concert TODAY 7pm. The music is just the gathering, support starts when you donate. To verified projects on the ground + a fund for musicians bringing relief. 🎟️ x.com/i/spaces/1DGLd… 👉 0xEdddAf6EB75F8f5d29B594E69a7A343eBd85A64e
English
1
6
17
344
BOLT EVM retweetledi
DeltaV (scaling arc)
DeltaV (scaling arc)@DeltaV_xyz·
🛳 An ecosystem of founders who ship every week @branchlesspay shipped 4 more ERP integrations in 48 hours, with Wave, Xero, and Zoho Books live. @LeverUp_xyz reported 154.6M 7D volume, 30,741 fees, 23,322 revenue, and shipped trading-system upgrades. @crshmarket crossed 800 verified users, 20K+ trading volume, and 1,000+ bets while starting UI overhaul. @captur_go has 4,176 MAU, 1,430 WAU, 34.2% stickiness, and 44.4% weekly contributor retention. @SntryFun reached 4,916,076 AI security decisions, signed off onchain revision, and ran pre-beta security hardening. @PingMe_xyz has 10,000+ connected merchants and completed second mobile on/off-ramp partner integration. @STOA_XYZ registered six agents, ran 21 audits, attested 12 onchain, and recorded 54,337 agent speeches. @AccountableData introduced continuously verified NAV feed with cryptographic attestations and tamper-evident ledger records. @kizzymobile launched social media roulette and its largest campaign to date around fixed-odds games. @OpenPermitAI built dashboard, SDK, MCP package, direct-onchain foundations, and the Monad testnet documentation. @surfcashx reached 9.1K users and 247K volume, with loans internally shipped and Intercom support upgraded. @monadmogs shipped full system hardening across Arena, agent flows, API, docs, and gameplay privacy. @Lka10nft shipped first portable component for B2B engagement, ready to deploy across the portfolio. The Emoverse built Kitsmith at Blitz, live brand-kit AI image and video studio with 178 logins. @specter_PQ shipped specter/sdk v0.3.0 on npm with encrypted announcement metadata and green CI. @DenariaFinance deployed Stylus-powered architecture on Arbitrum Sepolia testnet and started external security scan. @jester_keri launched leaderboard with all-time and weekly rankings, fixed NBA resolution, and indexed 5.2M blocks. @DemetherDeFi improved withdrawal process, sustained top-three legends[.]fun position, and tested Gold risk management. @withengine added 20-30 new users per day, with custom strategies and subscriptions near launch. @Purple_Layer shipped admin editing, prediction-market category, auto weekly reports, champion ranking, and duplicate-submission blocking. @YieldoHQ grew user base to 700, improved RPC scoring, and advanced strategy overview. @allocrypt added new live vaults for deposits, withdrawals, and multiple quote-provider fallback support. @TrendleFi refined market quality, market rotation, index behavior, discovery, and creator-led distribution. @planbokHQ earned payment from ticketing-platform customer and fixed scaling outage while developing stablecoin checkout. @facto_to signed enterprise deal with Turnkey and nearly finished endpoint, sandbox, and demo-app implementation. @akidirtyhands completed one live end-to-end sovereign leap across physical, Bitcoin, CKB, and EVM layers. @BOLTVR shipped game library, hardened Web3 security modules, and dynamic audio reactivity inside B3JS engine. @SpringX_Finance onboarded vaults and mining pools for cross-chain integration and announced migration decision. @ninjaverse_xyz tested redesigned tokenomics and implemented new dungeon mechanics for cooperative gameplay and replayability. @thinkeesenior launched test dashboard with unified navigation and connected Digital Twin and LifeNet modules. @monatrix_ag integrated RAG profile for agent. @jichu_xyz started the Monad testnet faucet, statistics dashboard, validator web app, and staking-management platform. Canonicals updated V2 papers and density[.]market pitch deck. @everdrawing prepared formal audit package after placing implementation work into audit-ready state.
English
14
10
58
10.9K
BOLT EVM
BOLT EVM@BOLTVR·
@v4rvl @Musashi13_DeCo @0xSero Sero deleted his response after claiming he did everything right its all Musashis fault.. he lied. Also I've had my 20k DeFi Protocol WCC @0xSero lost as well. Its not uncommon for this to happen when people want to get paid to build something for themselves instead of deliver.
English
1
0
2
23
🐙Musashi13🐙
🐙Musashi13🐙@Musashi13_DeCo·
@0xSero You did me dirty. I paid you $5,000 USDC to build an MVP. Now you have ghosted me for months and walked away with my life savings and my code. This is the first iteration of actions I will be taking to resolve the issue. I’m here to talk but you have to make a move. Law.
English
12
0
8
221
BOLT EVM
BOLT EVM@BOLTVR·
Claude's Fable Mythos 5 managed to program a library of Games within our Web3 Native Game Engine. It hardend our vault security for handtracking xr wallet interfacing. We also activated full audio reactivity. Frontier level AI for Entertainment, Productivity, and Security.
BOLT EVM tweet media
English
0
2
3
78
BOLT EVM
BOLT EVM@BOLTVR·
🧵 Governance in Web3 is broken. Participation is low, and rationales are buried. Introducing the VOX Protocol stack: A Voice-to-Intent framework that turns natural speech into cryptographically verified votes. 🎙⚡️ Here is how we're reshaping DAO governance
BOLT EVM tweet media
English
5
1
7
188
BOLT EVM
BOLT EVM@BOLTVR·
4/ Social Voting Hub Context is everything. The stack segregates audio stages by DAO (like ShapeShift, Uniswap, and Gitcoin), allowing token-holders to debate live on stage, chat in global lobbies, and sign votes synchronously as they talk.
English
0
0
3
36
BOLT EVM
BOLT EVM@BOLTVR·
3/ Resilient Local Fallbacks Off-grid? No problem. If API keys are absent, VOX's smart local keyword NLP engine handles intent extraction client-side. The governance pipeline never pauses.
English
0
0
3
32
BOLT EVM
BOLT EVM@BOLTVR·
2/ EIP-712 Cryptographic Proofs Trust is non-negotiable. AI assists, your keys decide. Once your intent is decoded, your wallet signs a standard EIP-712 vote payload locally, verifying authenticity via  ethers.verifyTypedData  before broadcasting directly to the @SnapshotLabs Hub
English
0
0
4
78
BOLT EVM
BOLT EVM@BOLTVR·
1/ Speech to Intent (AI-Powered) No more manually clicking choices or drafting justifications. Powered by Gemini, VOX parses your spoken words, extracts your voting choice and justification, and formats a structured payload with confidence scores in real-time.
English
0
0
3
43
BOLT EVM
BOLT EVM@BOLTVR·
🚀 BOLTEVM is strengthening Ethereum’s future. We’re excited to announce our Ethereum Security Initiative, in cooperation with TheDAO and Giveth’s upcoming Quadratic Funding Round. Together, we’re supporting community-driven efforts to enhance decentralization, resilience.
English
15
1
17
131