ESD HABBA KADAL
9.4K posts

ESD HABBA KADAL retweetledi
ESD HABBA KADAL retweetledi

A milestone achieved by KPDCL division awantipora by restoring 74 no. Of feeders in a record time by 04.00 PM. 04 no. Of feeders still underfault, restoration underway, efforts for 100 percent restoration by evening under process@kpdclofficial @cekpdcl @dcpulwama @SeKpdclpulwama

English
ESD HABBA KADAL retweetledi

All 11kv Feeders are Running Smoothly under the jurisdiction of ESD #TULMULLA
@kpdclofficial




English
ESD HABBA KADAL retweetledi

Face Marred by Dust, Sweat & the Strong blows of winds but striving Hard & valiantly, beating the cold .
SD Dalgate Team restoring power supply in Dal in shikara / water boats.
@KPDCLOfficial @OMCircle1 @XEd1st @pddjkofficial @cekpdcl


English
ESD HABBA KADAL retweetledi

The Wanpoh feeder was restored after locating and replacing the punctured 11KV insulator at TB Shah crossing after multiple sectionalized tries. @DCAnantnag @kpdclofficial


English
ESD HABBA KADAL retweetledi

Congratulations to the *team# KPDCL* for completing restoration successfully & professionally in shortest possible time. *100% of 33KV & 99% of 11KV feeders are Up* now. All praise to the field Engineers & field staff for their hardwork & dedication. *Appreciation to the Engineers and Field staff* who undertook restoration in heavy snowfall areas & despite all odds completed it successfully. *Kudos to KPDCL team.* *Grateful to Principal Secretary JKPDD* for constant encouragement. *Thanks to Divisional Commissioner Kashmir & District Administration* for their support and encouragement during restoration process.
@OfficeOfLGJandK @OmarAbdullah @DullooAtal @nasirsogami @DivComKash @kpdclofficial @diprjk @ErAaquibSWDeva @GreaterKashmir @RisingKashmir

English
ESD HABBA KADAL retweetledi

#Feeder_Status 8:00 AM
All feeders of the following #ESD'S are UP as per LCP
Nishat
Tangmarg
Sheikhbagh
Dalgate
@diprjk @OfficeOfLGJandK @GreaterKashmir

English
ESD HABBA KADAL retweetledi

#Feeder_Status 9:30 AM
All feeders of the following #ESD'S are UP as per LCP
Achabal
Keller
Karan Nagar
Rainawari
Kupwara
Rajbagh
Watergam
Baramula 1 & 2
Shopian
Hazuribagh
Trehgam & Tangdar
Handwara
Watalkadal
Khanyaar
Sumbal
Zakura
Zainakote
Dooru
Pampore
Chitragam
Khonmoh
Pattan
Anantnag
Rajpora except 1 FDR
Kulgam except 1 FDR
Budgam except 2 FDR's
Char I Sharif except 1 FDR
Tral except Saimoh(Partial)
Pulwama except F2(IGC)
Bijbehara except Batengoo
Bandipora except Ajar
@diprjk @OfficeOfLGJandK @GreaterKashmir

Filipino
ESD HABBA KADAL retweetledi

ALL OUR 11 KV FEEDERS ARE UP AND RUNNING AS PER LATEST CURTAILMENT PROGRAMME.
HOWEVER POWER SUPPLY IS AFFECTED TO DADDERKOOT FEEDER DUE TO DAMAGE OF CABLE AT RS BEHIBAG
@dmshopian
@kpdclofficial
@diprjk
@Informationspn
@shopiankmr
English
ESD HABBA KADAL retweetledi

Field warriors of ESD MANIGAM laying HT line of Watlar feeder to supply power to esteemed consumers in this snowy season. @cekpdcl @EdGanderbal @KpdclG @kpdclofficial
English
ESD HABBA KADAL retweetledi

#Unsungheroes: With steely resolve, #PDDlinemen restore #power in snow-covered #Kashmir
Reports Abid Bashir
@OmarAbdullah @manojsinha_
@diprjk @DivComKash
@kpdclofficial
risingkashmir.com/unsung-heroes-…
English
ESD HABBA KADAL retweetledi

33kv kathidarwaza line wherein a frame has been damaged due to fire emanating from BAMK industrial estate.@diprjk @cekpdcl @nasirsogami @kpdclofficial @DullooAtal @OfficeOfLGJandK


English
ESD HABBA KADAL retweetledi

The Power Department did a remarkable job dealing with the outages caused by the recent snowfall in the valley. These numbers tell the complete story. The supply of electricity dipped drastically between the hours of 4 AM & 10 AM as the system was hit by the snow. From 10 AM the demand starts recovering as the system was brought back online & the damage repaired. Kudos to @kpdclofficial for their work on the ground.


English
ESD HABBA KADAL retweetledi

"Behind-the-scenes heroes at work! KPDCL teams toil tirelessly in the field & workshops to restore your power supply ASAP. Your appreciation means the world to us! #KPDCL #PowerRestoration #Appreciation"
@diprjk @OfficeOfLGJandK @DullooAtal @nasirsogami @cekpdcl @ErAaquibSWDeva @GreaterKashmir @RisingKashmir



English
ESD HABBA KADAL retweetledi

Dear consumers,
Please pay your bills on time. Strengthen your service provider for better services.
Revenue Realization and load revision drive was undertaken in areas under jurisdiction of #ESD Sumbal
@diprjk @GreaterKashmir @nasirsogami @OfficeOfLGJandK


English
ESD HABBA KADAL retweetledi

Dear consumers,
Please pay your bills on time. Strengthen your service provider for better services.
Revenue Realization and load revision drive was undertaken in areas under jurisdiction of #ESD Sumbal
@diprjk @GreaterKashmir @nasirsogami @OfficeOfLGJandK


English
ESD HABBA KADAL retweetledi

As inspections continue to streamline the demand for power and educate the consumers on rational and judicious use of electricity, #KPDCL inspection teams witness indiscriminate hooking and use of crude heating gadgets.
Please STOP IT so that #KPDCL can adhere to the curtailment programme and not forced to undertake unscheduled power cuts.
Inspections in
#ESD Baramula 1
#ESD Mohra
#ESD Handwara
#ESD Kupwara
@diprjk @OfficeOfLGJandK @nasirsogami @GreaterKashmir



English
ESD HABBA KADAL retweetledi

#Advisory
In light of the forecast of Snowfall in some areas and inclement weather elsewhere, the #KPDCL has advised its Officers/ Staff to remain ready to meet any incident. The Ex. engineers/ Store Incharges shall provide all possible support to field staff. Strict adherence to SOPs and other Safety measures shall be ensured.
@diprjk
@OfficeOfLGJandK
@GreaterKashmir
@nasirsogami @CEDKPDCL

English
ESD HABBA KADAL retweetledi

#KPDCL reacts:
11 kV lines in question r decades old. Over a period of time, people have carried out new constructions in close proximity with these lines, without seeking prior permission. TKCs executing RDSS for reconductoring of 11 kV feeders have been stopped from working.
Greater Kashmir@GreaterKashmir
#HT wires in #Uri area pose risk to residents m.greaterkashmir.com/article/ht-wir…
English


