The Hazel McCallion Line

1.9K posts

The Hazel McCallion Line banner
The Hazel McCallion Line

The Hazel McCallion Line

@HMcCallionLine

A @Metrolinx project. 18 kilometres of new light rail transit connecting Port Credit GO Station in Mississauga to the Gateway Terminal in Brampton.

Brampton and Mississauga Katılım Mart 2016
190 Takip Edilen4.1K Takipçiler
Sabitlenmiş Tweet
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
This account is now closed. But don’t worry — we're meeting you where you’re at with our new Metrolinx Peel Facebook and Instagram accounts. (1/3)
The Hazel McCallion Line tweet media
English
4
1
7
1.4K
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
This account is now closed. But don’t worry — we're meeting you where you’re at with our new Metrolinx Peel Facebook and Instagram accounts. (1/3)
The Hazel McCallion Line tweet media
English
4
1
7
1.4K
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
...dans les communautés où vous vivez, travaillez et vous dive pour obtenir des nouvelles sur l’ensemble du réseau. De plus, vous pouvez suivre notre compte principal @MetrolinxFR pour obtenir des nouvelles sur l’ensemble du réseau. (3/3)
Français
0
1
1
151
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
Si vous vous intéressez à des projets autres que la ligne Hazel McCallion et la région de Peel, consultez nos autres comptes régionaux pour des mises à jour sur les travaux de construction, les progrès réalisés en coulisses et les nouvelles sur le transport...(2/3)
Français
1
1
1
172
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
Ce compte est maintenant fermé. Mais ne vous inquiétez pas : nous vous rencontrons là où vous en êtes avec nos nouveaux comptes de Metrolinx Peel sur Facebook et Instagram. (1/3)
The Hazel McCallion Line tweet media
Français
1
1
1
425
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
If you're interested in projects outside of the Hazel McCallion Line and Peel Region, check out our other regional accounts for construction updates, behind-the-scenes progress and transit news in the communities where you live, work and play. (2/3)
English
1
1
2
282
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
N’oubliez pas de suivre notre compte @metrolinx pour demeurer au fait des nouveaux développements sur les travaux de construction, des fermetures routières, des progrès en coulisses et des nouvelles de Metrolinx. (3/3)
Français
0
1
1
222
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
Les équipes coulent actuellement du béton, installent des éléments de structure et mettent en place des barrières de sécurité tandis que les travaux se poursuivent le long de la ligne Hazel McCallion. (2/3)
Français
1
1
1
319
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
Jetez un coup d’œil à l’avancement des travaux de construction sur la voie de guidage surélevée au-dessus de l’autoroute 403 à Mississauga. (1/3)
Français
4
1
6
699
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
Don't forget to follow @metrolinx to stay up-to-date on construction updates, road closures, behind the scenes progress and Metrolinx news. (2/2)
English
1
1
2
363
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
Take a look at the construction progress on the elevated guideway over Highway 403 in Mississauga. Crews are now pouring concrete, installing structural sections, and placing safety barriers as work continues along the Hazel McCallion Line. (1/2)
English
9
5
48
3.5K
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
Ces innovations témoignent de l’engagement du projet envers le confort, la sécurité et le bien-être des collectivités, en aidant la ligne Hazel McCallion à déplacer les gens de manière efficace, silencieuse et durable. (5/5)
Français
0
1
1
287
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
réduisent la quantité de bruit et de mouvements ressentis par les bâtiments à proximité. Enfin, les longs rails soudés, de longues sections de rail sans joint, éliminent les espaces et permettent un service plus silencieux et plus fluide. (4/5)
Français
1
1
0
303
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
Alors que la construction se poursuit le long de la ligne Hazel McCallion, nous intégrons des caractéristiques de conception qui contribuent à réduire le bruit et les vibrations. (1/5)
The Hazel McCallion Line tweet mediaThe Hazel McCallion Line tweet media
Français
1
1
2
486
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
These innovations reflect the project’s commitment to comfort, safety and community well-being, helping the Hazel McCallion Line move people efficiently, quietly and sustainably. (4/4)
English
0
1
3
235
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
which are installed along vibration-sensitive areas and reduce how much sound and movement reach nearby buildings. And lastly, continuously welded rail, which are long, seamless rail sections that remove the gaps that make for quieter, smoother service. (3/4)
English
1
1
4
313
The Hazel McCallion Line
The Hazel McCallion Line@HMcCallionLine·
As construction continues along the Hazel McCallion Line, we're using design features that help reduce noise and vibration. This means a smoother ride for passengers and quieter construction for nearby neighbourhoods. (1/4)
The Hazel McCallion Line tweet mediaThe Hazel McCallion Line tweet media
English
2
3
6
742