KB

914 posts

KB banner
KB

KB

@KBlikeKobe

Just here to win the league

Katılım Ağustos 2019
98 Takip Edilen38 Takipçiler
KB
KB@KBlikeKobe·
@thekyleyates I have a lot of problems with churches and religions. But I can absolutely respect someone who shows actual respect to their faith by calling out those that defile it. And by using their faith to try to advocate for others through their faith. You are both and you have my respect
English
0
0
4
3.6K
KB
KB@KBlikeKobe·
@GrahamBarfield Yeah Doubs was the one holding Watson back… Definitely. For sure. Absolutely.
English
0
0
1
264
Graham Barfield
Graham Barfield@GrahamBarfield·
The main fallout from Romeo Doubs to Patriots: Christian Watson 🚀 Watson had 38/647/7 receiving in 11 games (13.2 FPG – WR19) after knee injury We've seen elite efficiency: + 2.67 yards per route run in 2025 – fourth-best among WRs + 2.65 YPRR in 2024 – eighth-best
English
11
6
154
41.3K
Daniel Jeremiah
Daniel Jeremiah@MoveTheSticks·
WBC has me wondering--- if you had an NFL all-star team for each state (where you played HS football), who's in final four and who wins whole thing?
English
211
9
409
1.3M
KB
KB@KBlikeKobe·
@_NickWhalen Sure the defender removed it, but like I said, it wouldn’t be a catch with the same timing and no defender. You have to apply the catch rule before down by contact rule.
English
1
0
0
45
Nick Whalen
Nick Whalen@_NickWhalen·
@KBlikeKobe The weight of the defender and momentum are why the ball was removed from Cooks' hands. But Cooks had possession and was touched by the defender on the ground = catch
English
1
0
4
143
Nick Whalen
Nick Whalen@_NickWhalen·
Brandin Cooks caught that pass
Nick Whalen tweet media
English
9
7
93
5.9K
KB
KB@KBlikeKobe·
@DrewDavenportFF @spokesnbeer Ah yes you’re only allowed to not quit when your team is scoring heavily. I mean obviously they didn’t quit. The narrative if they lost is we were down 2 big receivers, the packers are still a good defense, and Malik played a hell of a game. It happens. But we didn’t quit&won
English
0
0
1
24
Drew Davenport
Drew Davenport@DrewDavenportFF·
@spokesnbeer They scored 9 points in 58.5 minutes...but they're the team that won't quit? What's the narrative if they don't recover the onside?
English
1
0
0
47
Drew Davenport
Drew Davenport@DrewDavenportFF·
The post-game interview with Caleb saying "we know who we are" is so fraudulent. You scored 9 points before you needed a 4% shot on an onside kick to get you another chance. Please spare us the nonsense.
English
21
3
39
9.1K
KB
KB@KBlikeKobe·
@BGWhitefield Pocket awareness looks pretty rough would be my concern. But I’m neither a qb expert nor watched every game. But I just feel uncomfortable watching him if he has to move at all
English
0
0
0
171
Brett Whitefield
Brett Whitefield@BGWhitefield·
Mendoza accuracy and ball placement is the best we’ve seen from a prospect in a while.
English
8
0
25
6.5K
KB
KB@KBlikeKobe·
@minakimes he actually deserves the award this year. So it will probably go to TJ Watt, like the Lamar/ Josh Allen switch on MVPs.
English
0
0
1
427
KB
KB@KBlikeKobe·
@kelsey_surmacz4 Arguably dumbest tweet of the day and wouldn’t even stand up to your own counterpoints. Where did they compare them? What were the comparisons? You brought stats into a photo request. Just shut up
English
0
0
0
18
Kelsey Surmacz
Kelsey Surmacz@kelsey_surmacz4·
They're not rookies who scored 50-plus goals (Ovi) and 100-plus points (both) and were immediate superstars. Not taking anything away from Celebrini or Bedard, but let's pump the brakes. People forget how great Ovi and Sid were immediately upon arrival. That just doesn't happen.
Ovi@OviClapBomb

Bedard & Celebrini should recreate this.

English
149
206
4.2K
375.6K
KB
KB@KBlikeKobe·
@SportsMT 100%. What needs to happen is schools need to stop paying premium prices on long deals for mid coaches. It’s their own fault.
English
0
0
2
201
KB
KB@KBlikeKobe·
@angelo_fantasy There’s a man down there in Jax that is known for hampering good young WRs. And I know a lot of things are BTJ’s own fault, but Rome had multiple of his own issues too and looks fine now. Don’t trust a guy that slowed down JSN.
English
1
0
4
308
AngeloFF
AngeloFF@angelo_fantasy·
At some point, you just can’t trust Thomas Jr. as your primary read. Having such trouble away from frame, and even when it’s clean it looks like it surprises him. More Hunter pls.
English
5
1
35
7.4K
KB
KB@KBlikeKobe·
@visiblecare for the love of god just give me whatever QR code I need to switch my existing service to a new phone before I freak out, please.
English
1
0
0
13
KB
KB@KBlikeKobe·
@ScottBarrettDFB That’s pretty impressive for someone who has probably about 37 total career pass attempts!
English
0
0
3
2.2K
Scott Barrett
Scott Barrett@ScottBarrettDFB·
J.J. McCarthy's Resume 8th grade: offered a full scholarship from Iowa State (Power 5 school) 9th grade: varsity redshirt 10th grade: 13-1, won the state championship with a broken thumb on his throwing hand 11th grade: 13-1, lost the state championship 12th grade: 8-0, won the national championship CFB Freshman: zero games started CFB Sophomore: 12-1 as the starter CFB Junior: 15-0, won the national championship NFL Rookie: zero games played Combined: 61-3 record as a starter
English
120
242
7.7K
1.7M
KB
KB@KBlikeKobe·
@DFSnDONUTS I’m a huge fan of “3rd least amount of rush yards to wr” type stats bc they’re so hard to find thru like google etc. And it’s a pretty good base info to have. Way better imo than like “3rd best defense” bc maybe they give up a ton of rb dump offs and THAT is the info that helps
English
0
0
1
14
KB
KB@KBlikeKobe·
@Shura_of_hatred Brother shut the fuck up. You don’t get to go in condescending scorched earth and then “oh I just like them and wanted to inform people” no the fuck you didnt “just like them” I looked through the thread only to not actually see any info just “I’m better than you”
English
0
0
1
18
#NoMusicNoIntro
#NoMusicNoIntro@askmetostay323·
3 is exactly my point :)))
English
1
0
2
5.7K
KB
KB@KBlikeKobe·
@Spotify why did you ever set the default to playlists repeating. It’s honestly infuriating
English
0
0
1
5
KB
KB@KBlikeKobe·
@thekyleyates Obviously. That was like 4 or 5 years ago, right?
English
0
0
1
39
Kyle Yates
Kyle Yates@thekyleyates·
THIS WAS 2011?!
English
1
0
6
6.9K