ThinkEdu Academy
164 posts


@ThinkeduAcademy @JAMBHQ @FabianB58246501 @winexviv This is my centre and I am an affected candidate. It was infact over 200 affected students. The centre tried to switch from generator to solar in the middle of the exam and it affected the connection which led to submission of the exams before the time was up. Please Reschedule


250 students were logged out mid-exam due to a power switch from generator to solar at Olive House Academy, Orimerunmu, Ogun State during the 9AM exam on Thurs, 16th 2026.





250 students logged out mid-exam after a power switch from generator to solar at a school in Ogun State




About 250 students were logged out mid-exam (Jamb) due to a power switch from generator to solar at Olive House Academy, Orimerunmu, Ogun State during the 9AM exam on Thurs, 16th 2026. I have gotten many similar complaints from students around the country. A country without 24/7 electricity is running a computer-based exam. What an irony!

250 students were logged out mid-exam due to a power switch from generator to solar at Olive House Academy, Orimerunmu, Ogun State during the 9AM exam on Thurs, 16th 2026








