
#operationbrock = operation silence. Saw literally 2 trucks..How much does this cost the taxpayers though.
English
folkestonisbeautiful
87 posts

@folkestoneisb
Instagram: folkestoneisbeautiful






















@v11nny There was a fault on the set that had to be terminated at Ashford. The faulty piece of equipment on that 6-coach set meant it couldn't run over the High Speed Line to London. Unfortunately there were no replacement sets available. Sorry for the inconvenience. ^PR









