Southern Railway has notified opening of MRTS extension from Velachery to St Thomas Mount from March 14th 2026.
🔹43 pair btw Beach - St Thomas Mount
🔹2 pair btw Beach - Velachery
🔹3 pair btw St Thomas Mount - Velachery
On 17.10.2024, allegations were made in a press meet by a person named Yamini Ragani.
Yamini had volunteered at the #IshaHomeSchool as a teacher from 2022- 2024, after her son had graduated from the school. She was relieved from the school earlier due to concerns and complaints against her.
The claims being made by her are completely unfounded, and we take such matters very seriously.
We wish to reiterate that children's safety has and will always be our top priority. We maintain a strict no-tolerance policy for any behaviour that compromises the safety and integrity of our children and community.
All the allegations levelled by her are false and baseless.
The Tamil Nadu Commission for Protection of Child Rights has already done a thorough study on Isha Home School and has given a clean chit by praising various aspects of the School.
Isha Home School will be taking appropriate action against her, in accordance with the law.
-Admin, Isha Home School
TBM Kaveri Breakthrough at Adyar Junction Station
Chennai Metro Rail Limited is in the process of implementing the much -anticipated Phase 2 project across Chennai City in full swing with three corridors for a total length of 116.1 km.
In Corridor 3, the tunnelling works from Greenways station to Adyar junction station commenced in February 2023. The length of each tunnel is 1228m. The tunnels pass below Adyar River for a length of 300m with an overburden of 10-13m.
Two Earth Pressure Balancing (EPB) TBM’s namely ‘Kaveri’ and ‘Adyar’ are engaged for this work. Kaveri successfully completed the tunnel drive and TBM breakthrough at Adyar shaft. This TBM has passed mixed geological conditions like bottom of the tunnel is rock and top of the tunnel is sand. TBM also tunnelled through full-faced hard rock below some portion of the Adyar River. TBM underwent 65nos cutter head interventions (CHI) to replace cutting tools in the TBM face and consumed 178days for CHI. The TBM also passed below a few Petrol bunks, MGR Janakicollege, Andra Saba Hospital, Durgabai Deshmukh road and Adyar bridge ramp. The 2nd TBM ‘Adyar’ is currently 277m away from the Adyar shaft and expected to reach Adyar shaft by November 2024.
Thiru T. Archunan, Director Projects of CMRL, Thiru. Anto Jos Menachery, GM CIVIL UG, Thiru. M.Ravichandran, GM CIVIL UG, Thiru. Tony Burchell Team Leader of GC, Thiru. Sanjeev Mandal, CRE NKAB, Thiru. Jayaram, Project Director of L&T, Thiru. Ahmet, Project Manager L&T, Thiru. Alan Charles May, NKAB Tunnel expert other officials of CMRL and General Consultant were present during the event.
#chennaimetro#cmrl#chennai#metrorail#phase2
Aakiii❤️🤗🙏🏾
Thank you so much , means a lot!!!
Been there through my tough times and you still are❤️🙏🏾
First yoga and then eat, sleep, train, repeat 😉😂
Shambhavi almost everyday during the season is helping me immensely 🙏🏾🧘🏾♂️
Most timely that the Hon’ble Prime Minister is directing the Nation’s focus toward mental health. Taking charge of our mental faculties is one hundred percent our responsibility - not only for ourselves, also for our communities, the society and the Nation. Let’s make it happen. -Sg @narendramodi#MannkiBaat#MentalHealth#InnerEngineering
@airtelindia it's been 25 days since my internet and land line is not working and everyday I'm getting 3 to 4 sms that it will be resolved at the earliest. Where should I complain further? @Airtel_Presence@airtelnews