
Eddy Tree
5.3K posts

Eddy Tree
@EddyTree1960
Elon Musk fan, Tesla and SpaceEx Investor, Brooklyn Nets, psychological thriller movies and books, Aerosmith, Pickleball, that’s me in a nut shell. 🔋



NEWS: NASA Administrator Jared Isaacman announced today a $20 billion plan to build a permanent U.S. base on the Moon over the next 7 years. NASA is cancelling plans to deploy a space station in lunar orbit. “NASA is committed to achieving the near‑impossible once again, to return to the Moon before the end of President Trump’s term, build a Moon base, establish an enduring presence, and do the other things needed to ensure American leadership in space. The clock is running in this great‑power competition, and success or failure will be measured in months, not years. If we concentrate NASA’s extraordinary resources on the objectives of the National Space Policy, clear away needless obstacles that impede progress, and unleash the workforce and industrial might of our nation and partners, then returning to the Moon and building a base will seem pale in comparison to what we will be capable of accomplishing in the years ahead.” The plan: Phase One: Build, Test, Learn NASA shifts from bespoke, infrequent missions to a repeatable, modular approach. Through CLPS (Commercial Lunar Payload Services) deliveries and the LTV (Lunar Terrain Vehicle) program, the agency will increase the tempo of lunar activity, sending rovers, instruments, and technology demonstrations that advance mobility, power generation (including radioisotope heater units and radioisotope thermoelectric generators), communications, navigation, surface operations, and a wide range of scientific investigations. Phase Two: Establish Early Infrastructure With lessons from early missions in hand, NASA moves toward semi‑habitable infrastructure and regular logistics. This phase supports recurring astronaut operations on the surface and incorporates major international contributions, including JAXA’s (Japan Aerospace Exploration Agency) pressurized rover, and potentially other partner scientific payloads, rovers, and infrastructure/transportation capabilities. Phase Three: Enable Long‑Duration Human Presence As cargo‑capable human landing systems (HLS) come online, NASA will deliver heavier infrastructure needed for a continuous human foothold on the Moon, marking the transition from periodic expeditions to a permanent lunar base. This will include ASI’s (Italian Space Agency) Multi-purpose Habitats (MPH), CSA’s (Canadian Space Agency) Lunar Utility Vehicle, and opportun.




Darius Acuff Jr.'s five postseason games: 37 PTS | 5 AST | 11-21 FG | 5-9 3FG 24 PTS | 7 AST | 7-21 FG | 2-7 3FG 30 PTS | 11 AST | 9-20 FG | 5-8 3FG 24 PTS | 7 AST | 9-19 FG | 2-5 3FG 36 PTS | 6 AST | 11-22 FG | 3-6 3FG 30.2 PPG | 7.2 APG | 45.6 FG% | 48.6 3FG%



If you are a leader of a country, it's your task to speak in a way that doesn't allow 80% of the world to hear "be evil". Blaming people that they hear what most others hear is a very bad strategy. Owning the consequences of your words and actions is very important, because if you don't, you lose trust on an exponential scale. It's just not going to end well until the Israeli government makes a visible turnaround.



President Trump celebrates the passing of former FBI Director and Special Counsel Bob Mueller.



@JOBhakdi If Iran rages on, as I think it will, into and thru summer markets will not rebound for some time Robotaxi scaling or not




@JOBhakdi If the market crashes Jo and the war drags on into a total disaster the Americans can't get out of. Would this effect Tesla share price in the next 18 months or is it just short term and then strong recovery. Thanks for your great work. Really respect your thoughts on Tesla.

@JOBhakdi What about PLTR, drones and RKLB?








