
FReddych 🧢🚀🔋🏬
5.8K posts

FReddych 🧢🚀🔋🏬
@FReddych
https://t.co/usJjdpXKHT



Battery Line 2 has successfully completed Factory Acceptance Testing (FAT), validating system performance under real operating conditions ahead of installation! This milestone reflects the disciplined, process-driven execution required to scale advanced manufacturing. Line 2 is purpose-built to expand overall production capacity and incorporates key enhancements, including a single-piece flow configuration, increased process redundancy, and advanced pick-and-place gantry systems to drive faster cycle times and improved efficiency. These design improvements, along with the Thorn Hill building layout, are expected to translate into meaningful gains: 1. Raw material travel reduced from approximately 2.09 miles to 0.29 miles —86% reduction 2. Line length reduced from approximately 478 ft (Line 1) to 288 ft (Line 2) — 40% reduction Next stop: installation at the Eos Thorn Hill facility.







ok Waymo do I get an Idiocracy Starbucks too during the ride?








LATEST: Elon Musk says AI will make jobs "optional" in the future due to "universal high income."

































