
0.48 mile bridge taken out in China, rebuilt in 7 days
1.6 mile bridge taken out in US, rebuilding estimates are (at earliest) late 2025
Sharing Travel@TripInChina
Seven days to build a temporary bridge, after the Lixinsha Bridge in Guangzhou was broken by a ship. The temporary bridge was opened this morning.
English




