
SrDSTE/Co/BCT
25 posts



@AmitBhadricha @drmbct
Indicators of foot over bridge at Marine line rectified.
English

@viralvm69 @drmbct
All out efforts are being made to ensure minimum signal failures in section.
English

@ankedparalkar @drmbct
Indicator on pf no 1 of Dadar stn attended and made functional.
English

@AmitBhadricha@drmbct
North indi of pf3 atAndheri failed as power supply failed, ind.restored after its resumption.

English

@DevangGandhi26 @drmbct
Coach guidance bds shall be provided by 31.3.16 at pf 6 & 6A at Borivali stn.
English

@sushil_pandya @drmbct
Train indicators for long distance trains will be provided at Borivali by 31.3.16 on PF 6 and 15.4.16 on PF 4.
English

@vishantpai @drmbct
Coach indicator at Andheri will be replaced by 31.7.16.
English

@vishantpai @drm
Coach indicators at Andheri will be replaced by 31.7.16.
English

@Mandarmodak @drmbct
Thanks for your suggestion. It will be examined.
English

@Mandarmodak @drmbct
Specific station name along with platform no. may be mentioned .
English

@r_dhariwal @drmbct
Work of providing Indicator for NIG south subway is in progress & will be completed by 03.03.16.
English

@PalavVishal @drmbct
Pending time shown will be 00 for 7:42 train orignating from Bhyander as train is pulled from Bhaynder yard to PF 3.
English



