rob eloff

210 posts

rob eloff

rob eloff

@robeloff

adventure capitalist in the techno industrial universe

Los Angeles, CA Katılım Mart 2011
344 Takip Edilen339 Takipçiler
Gaurab Chakrabarti
You cannot buy a new gas turbine until 2030. Order books at GE, Siemens, and Mitsubishi stretch to 2029. Turbine prices have nearly tripled since 2019. Every AI data center needs power and every gas plant needs a turbine. And every turbine has one part that bottlenecks the entire industry: The blade. It has to survive in gas 500°C above the melting point of the metal it's made from and spin at up to 20,000 RPM under 10,000 g of centrifugal force. Each blade is grown as a single crystal of nickel superalloy, pulled through a vacuum furnace at 3 mm per minute. A set of blades costs $600,000 and takes 90 weeks to grow. The same metallurgy powers modern jet engines. Only 3 companies on Earth can build one. China spent $42 billion trying to catch up. They bought a Russian fighter engine, took it apart, and copied every part. Their copy ran 30 hours between overhauls versus 400 for the original. Modern Western engines run 4,000. You can reverse engineer the shape of a turbine blade. You cannot reverse engineer 60 years of metallurgy.
Gaurab Chakrabarti tweet media
English
1.1K
5.9K
29.1K
3.8M
rob eloff retweetledi
Ruairí McLoughlin
Ruairí McLoughlin@RoMcLocko·
Built this in 7 days in El Segundo All-in cost: <$1,000 Working photobioreactor • sensors, controls, light delivery This is how fast iteration in biomanufacturing can move Now imagine 1 month Now imagine 1 year Autonomous, robot-driven bioreactors coming next We’re Raising
Ruairí McLoughlin tweet media
English
4
13
142
9.8K
rob eloff retweetledi
David Zagaynov
David Zagaynov@DavidZagaynov·
a little aura farming and then back to work really big new planes coming soon
English
36
47
962
51.9K
rob eloff
rob eloff@robeloff·
Don’t sleep on @JakeJurewicz. For the U.S. to deliver scaled fission, balance of plant is the bottle neck. The team at Blue Energy execute at the speed and cost required for energy abundance. @tamarackglobal is honored to have the opportunity to continue backing this team techcrunch.com/2026/04/21/blu…
English
0
1
9
89.9K
rob eloff retweetledi
Tom Mueller
Tom Mueller@lrocket·
This is exactly the type of leadership we need right now to get us back on track. To the moon.!
NASA Administrator Jared Isaacman@NASAAdmin

To build a sustained human presence on the Moon, we are building @NASAMoonBase, prioritizing surface operations and scalable infrastructure.  - Frequent robotic landings and mobility testing including MoonFall drones  - Starting in 2027 nearly monthly cadence of equipment and rovers with scientific payloads landing on the Moon.  - Investments in power, communications, and surface mobility  - Scalable infrastructure to support long-term human presence The objective is clear: build the foundation for an enduring lunar base and take the next step toward Mars.

English
28
57
1.2K
37.3K
Jakob Diepenbrock
Jakob Diepenbrock@jakobdiepen·
If this seems like something you NEED + you’re building a company CRITICAL to the national interest, come to El Segundo and be a part of a @DiscipulusVent Cohort. 🇺🇸
George Munguia@jobsbygeorge

hey @elonmusk can you make an “xcombinator”?? the future of the USA needs a leader/fund that solely focuses on: - reindustrialization - hardware - software for hardware - manufacturing / industrials - defense tech - mining etc.

English
7
10
86
8.8K
rob eloff
rob eloff@robeloff·
@brexton @austinbishop Capital fluency is our business @tamarackglobal if you need directions on who wins at leasing, lending, warehouse financing and growth funding besides the obvious names us up.
English
1
0
0
193
brexton
brexton@brexton·
I’ve never seen so many startups raising debt As more startups tackle physics-heavy problems (w heavy capex), more of venture will want to look like merchant banks & have capital markets expertise Given how insular venture is, there are very few firms who are built for this
English
13
6
179
17.3K
Starlight
Starlight@StarlightSolar_·
Introducing Starlight Air, the world lightest space solar panel. Order today at terawatt.space Engineered by Starpath in California.
English
68
131
1.1K
303.8K
rob eloff retweetledi
Core Memory
Core Memory@corememory·
We went to LA and saw some things. Get on your knees.
Core Memory tweet media
English
4
15
188
62.3K
rob eloff retweetledi
Divergent
Divergent@Divergent3D·
In partnership with @Mach_Industries, Venom moved from clean-sheet concept to flight hardware in just 71 days using the DAPS™ manufacturing platform. This milestone demonstrates how software-defined manufacturing delivers deployment-ready hardware at a fundamentally different pace. Read more: divergent3d.com/company/news/s…
English
0
18
129
7.6K
rob eloff retweetledi
Divergent
Divergent@Divergent3D·
Divergent is proud to announce that it has been awarded a position on the Missile Defense Agency’s Scalable Homeland Innovative Enterprise Layered Defense (SHIELD) IDIQ. The goal of the $151B-ceiling SHIELD IDIQ is to rapidly field, scale, and sustain advanced capabilities in support of America’s Golden Dome missile defense initiative. Divergent welcomes the opportunity to partner with the Department of War and innovators across the industrial base to deliver next-generation manufacturing capabilities that enable faster development, qualification, and fielding of critical missile defense technologies.
English
1
3
12
1.2K
rob eloff
rob eloff@robeloff·
Not every day you can take a stroll down memory lane to see the world’s first nuclear power plant. EBR1 was built in Idaho 75 years ago.
rob eloff tweet media
English
0
0
0
98