@RailwaySeva@opeaneyes_true@drmpune Site attended; no water leakage observed from the tap. The tap is disconnected due to FOB work. Another water stand is available within 100 m under COP.
@sanjay1982296@RailMinIndia@drmpune We regret the inconvenience caused to passengers.
The cable cut occurred during JCB work by Const. Dept on the new proposed line KSTH–DD at OHE Mast 269/39–41.
Penalty will be recovered from the contractor. S&T staff attended, reconnection given at 17:30 hrs in presence of RPF.
@clean_pune@AshwiniVaishnaw@drmpune@RailwaySeva Staff have been deputed to repair broken tiles and floor work. TDC 20/12/2025. शिकायत कर्ता का किसी भी प्रकार का कोई संपर्क नहीं दिया गया है इस कारण विस्तृत विवरण नहीं ले पाये हैं ,एवं शिकायत कीये हुवे सभी समस्या का वर्तमान मे रेल्वे के सभी संबधित विभाग द्वारा काम जारी हैं |
Today visited platform 4 at Pune railway st Shocked on pathetic conditions of platform with broken tiles which were at risk to passengers Also car park on boat club road side has lot of garbage illegal parking of rickshaws #fixthebasics@AshwiniVaishnaw@drmpune@RailwaySeva
@mayuresh2016@drmpune@bksinspj For GRWD Station at DN Side , height above rail level for high passenger platform is satisfactory.
But for sub-urban , height have to be increased. Works will be carried out soon.
@drmpune@bksinspj Please Look At Gap Between Footboard And Platform At Ghorawadi Rly Station (Down Platform). Requesting You To Please Increase Platform Height.
Ye Pune Suburban area ka Kasarwadi railway crossover bridge he jo kasarwadi railway station me aata he ..ye tooti hui farsh 2 mahine se aise hi he . please take necessary actions @Central_Railway@RailMinIndia@punekarnews