Solar is starting to look like a win win:
- Fastest source of new power to deploy
- Republicans have limited room to push back given power constraints, rising electricity bills and the fact that solar already polls extremely well even among Trump voters
- Upside optionality if Democrats perform well in the midterms


English
₿ 💥 retweetledi

@ItsKimJava @Tesla I can’t get mine to back into my garage to save my life..
English

Micron now trades with a ~10x multiple
S&P 500 has a P/E ratio of ~21x
Gunjan Banerji@GunjanJS
"A 770% stock surge has made Micron one of America’s most valuable companies. Yet its profits have increased so much that the stock actually looks cheap by traditional valuation metrics" Shares are trading at 8.9x the co's projected earnings over next 12m, compared with 23x for S&P 500 wsj.com/finance/stocks…
English

DATA CENTER MAP- And how I learned we really are relying on folks self-reporting what they're seeing in their communities.🫣
Environmental activist Erin Brockovich launched a site to report data center concerns amid a rapid expansion across the US.
brockovichdatacenter.com

English

The US Department of Energy just mapped every data center in America.
This is what the AI power grid looks like.
The dots are data centers.
Yellow = operating.
Orange = under construction.
White = planned.
The lines are high-voltage transmission 735kV, 500kV, 345kV the arteries that move electrons from generators to compute loads.
Look at the density along the East Coast, Northern Virginia to the Carolinas.
Then look at Texas.
Then Northern California.
The largest circles on this map represent facilities demanding over 5,000 MW of power.
Single campuses pulling more electricity than mid-sized cities.
Northern Virginia is so dense the dots overlap.
Data centers cluster on transmission corridors.
Not because land is cheap because power is available.
When the line is full, the next data center goes somewhere else.
The grid is the bottleneck.
Every orange dot is a power purchase agreement being negotiated right now.
Every white dot is a utility commission filing, a gas plant approval, a pipeline capacity booking.
The $66.8 bn NextEra-Dominion deal, Meta's 10 new gas plants in Louisiana, the Alaska LNG FID push they all trace back to maps that look like this.
AI infrastructure is built in substations, on transmission corridors, and at the end of gas pipelines.
Link in the comments, to see my stocks 👇