
We, ACME Solar, through our subsidiaries, have commissioned an additional 155 MW / 470.25 MWh of Battery Energy Storage System (BESS), taking our total commissioned capacity to 297.67 MW / 951.74 MWh.
Located in Rajasthan, these BESS projects are connected to the Inter-State Transmission System (ISTS) and will operate on a merchant basis, enabling revenue through peak and non-peak price differentials.
Designed to charge during low demand and discharge during peak hours, these systems enhance grid reliability, optimise power utilisation, and support overall grid stability.
#ACMESolar #BatteryEnergyStorage #BESS #RenewableEnergy #CleanEnergy

English























