ทวีตที่ปักหมุด

$DGXX — Why I’m so Bullish
Power (the real moat)
• ~196.7MW total available power NOW (Alabama + New York)
• 55MW Alabama site — ARMS 200 modules delivered & being implemented
• ~21 additional acres secured in North Carolina for planned 200MW site
• West Virginia LOI tied to 1.3GW power plant (non-binding, but major upside)
• NY operations include North Tonawanda power plant
• FERC/PSC regulated infrastructure
AI Infrastructure Buildout
• ARMS 200 modular data center platform
Liquid cooled
Rapid deployment design
Patent filed
• $20M NVIDIA B300 GPUs secured
• B200 cluster implementation underway in Alabama
• NeoCloudz GPU-as-a-Service targeting Q1 2026
• Full-stack model: Power + Tier III data center + AI servers + GPUs
Leadership
• @hansvestberg (former Verizon Chairman & CEO) — Senior Advisor
• Jagan Jayapal — CTO
– Former engineering leader at Oracle, Equinix & VeriSign
– Deep hyperscale + cloud infrastructure background
@michelamar3 Leading the charge in attracting top talent to create the vision
Balance Sheet & Structure
• ~$97M liquidity reported (as of late 2025)
• No long-term debt
• Settlement closed (reduced overhang)
• Uplisted to Cboe Canada
Wrapping up!
Power secured.
GPUs secured.
Land secured.
Leadership in place.
Small cap $180m Mcap building real AI infrastructure.
Do your own research.
$iren $hut $slnh $cifr $glxy $bitf $wyfi $btdr
English

















