Samuel Woldenberg

207 posts

Samuel Woldenberg banner
Samuel Woldenberg

Samuel Woldenberg

@samwoldenberg

@TitegHQ (building for the physical world) + host of Industrialized

شامل ہوئے Ocak 2019
499 فالونگ354 فالوورز
Samuel Woldenberg
Samuel Woldenberg@samwoldenberg·
love how the flexport tariff simulator is already updated with all the new section 232 cluster fuck thx @typesfast
English
0
4
20
6K
Atomic Industries
Atomic Industries@atomic_inc·
Reindustrialization will continue until morale improves
Atomic Industries tweet mediaAtomic Industries tweet media
English
3
9
86
4.9K
Yossi Farro
Yossi Farro@FarroYossi·
Had the honor of wrapping tefillin with Dylan Field (@zoink), founder & CEO of @figma, right after his talk at Hill & Valley Forum today.
Yossi Farro tweet media
English
10
4
170
24.3K
Meltem Demirors
Meltem Demirors@Melt_Dem·
plastics is a global market that supports all parts of modern life but it is a structurally opaque market the global $1T plastics industry trades on bilateral long-term contracts. there are no exchange traded plastics, only feedstocks. there is no system of record for transaction data. clearing prices are never disclosed. massive opportunity to create a better data set and more formal market structure around it.
English
16
1
67
10.3K
Samuel Woldenberg
Samuel Woldenberg@samwoldenberg·
If ur trying to build in the physical world here ya go.
Aaron Slodov@aphysicist

here is a definitive reading list for budding reindustrialists: phase 1: operations & optimization: the toyota way lean principles, waste elimination, management systems, and continuous improvement for building efficient, high-quality production. the goal a practical introduction to bottlenecks, throughput, and flow through the lens of theory of constraints. factory physics a rigorous foundation for understanding queues, variability, capacity, and the behavior of real production systems. the machine that changed the world a foundational book on lean production and the evolution of modern manufacturing systems. sources of increased efficiency in the dupont rayon plants a close look at industrial productivity, management, and operational efficiency inside a major american manufacturing system. phase 2: scaling & historical inspiration: freedom’s forge industrial mobilization, production scaling, and wartime coordination at national scale. my life and work firsthand perspective on mass production, vertical integration, simplification, and industrial philosophy. my years with general motors management, decentralization, strategy, and organizational design inside one of america’s great industrial firms. behemoth a history of giant factories and the role they played in shaping industrial civilization. arsenal of democracy the transformation of american industry toward war production, with lessons in speed, conversion, and manufacturing scale. the deindustrialization of america an account of industrial decline, disinvestment, and the structural forces that weakened american manufacturing. reindustrialization of america a period view on rebuilding industrial capacity and restoring productive strength in the united states. kochland a study of industrial power, corporate systems, and one of the most consequential private industrial empires in america. phase 3: strategic context & modern realities: chip war semiconductors, geopolitics, and the strategic importance of advanced industrial supply chains. apple in china a close look at supply chains, industrial concentration, manufacturing capability, and the strategic consequences of offshoring advanced production. made in the usa materials, energy, production systems, and the physical realities behind large-scale manufacturing. energy and civilization broad historical context on how energy systems underpin industrial growth and civilizational scale. where’s my flying car? a case for technological ambition, industrial acceleration, and the lost momentum of physical progress. science mart an examination of how science, markets, and institutions reshaped american innovation. discovery-driven growth a strategy framework for navigating uncertainty while building ambitious new ventures. phase 4: finance, economics & capital allocation: economics in one lesson a compact introduction to economic reasoning, incentives, and second-order effects. “the curse of machinery” is especially relevant for industrialists thinking about productivity, labor, and industrial progress. the outsiders capital allocation, CEO decision-making, buybacks, acquisitions, decentralization, and how exceptional operators think like owners. investment banking a practical guide to valuation, deal structure, and the financial mechanics behind acquisitions, leverage, and strategic transactions. distressed debt analysis credit, restructuring, downside analysis, and how to think through broken balance sheets and mispriced industrial assets. bonus: steelhead job shop playbook practical lessons on quoting, sales, operations, workforce, and growth for metal and job-shop businesses. ben einstein’s blog and writings practical lessons from hardware startups, manufacturing execution, and company building. skunk works lessons in innovation, speed, engineering culture, and rapid development under intense constraints.

English
0
0
1
59
Samuel Woldenberg
Samuel Woldenberg@samwoldenberg·
“The problem is that tolerance of everything often constitutes belief in nothing” - Alex Karp
English
0
0
0
29
Fivos Aresti
Fivos Aresti@fivosaresti·
Companies are going to start paying GTM Engineers $150K+/year. They can do it all: 1. Set up email infrastructure 2. Build targeted lists 3. Enrich data from multiple sources 4. Score leads into tiers 5. Route leads to reps 6. Run automated outbound 7. Build awareness scores 8. Orchestrate inbound systems That said... I put together a full cheatsheet that covers the entire role from start to finish... • Strategy plays for warm, signal-based, and cold outreach. • Data aggregation across CRM, 1st party, 2nd party, 3rd party, and database sources. • Data enrichment workflows to filter, normalize, score, qualify, and segment. • Data activation across outbound, RevOps, content, and ads. Plus full outbound and inbound sales workflow breakdowns... KPIs for production, distribution, and conversion... And a curated book list to go deeper. Whether you're a GTM engineer, sales leader, or founder doing outbound yourself... This is the only reference guide you need. If you want it for free: Comment "GTME" And I'll send it over ASAP. PS - This cheat sheet includes 20+ tools, 8 book recommendations, and frameworks used by top GTM teams generating millions in pipeline.
Fivos Aresti tweet media
English
666
68
929
86.5K
Ryan Petersen
Ryan Petersen@typesfast·
Container shipping enjoyers will love Flexport Atlas, our new (free to use) interface for browsing the world's ocean network. Search any two ports to see all the actual routes available and their relative transit times. Still in Beta with lots of improvements planned, but it's already incredibly useful. And unlike Stripe Atlas, OpenAI Atlas and many other great software products named Atlas, Flexport Atlas is actually an atlas.
English
25
33
562
78.9K
Samuel Woldenberg
Samuel Woldenberg@samwoldenberg·
@zanehengsperger hmmm. i believe its: %production utility / capacity as a macro, we need to bucket and define what exactly capacity is.
English
0
0
1
52
Zane Hengsperger
Zane Hengsperger@zanehengsperger·
what are the main 1 or 2 indicators that America has been Reindustrialized? i'd like to track it as a stat in our office and see how everything we do progresses towards that main goal
English
39
4
106
11.4K
Elon Musk
Elon Musk@elonmusk·
Tunnels are so underrated
Aakash Gupta@aakashgupta

The real story is the $25 million per mile price tag they’re betting on. Nashville’s own 2018 light rail plan priced at $200 million per mile. New York’s East Side Access cost $3.5 billion per mile. The LA Metro expansion is running $1 billion per mile. The Boring Company says it can build 13 miles of twin tunnels through Nashville for $240-300 million total. That’s a 95% cost reduction from the industry average. If the number holds, it rewrites the economics of every transit project in America. If it doesn’t, a few hundred million in private capital evaporates and taxpayers lose nothing. That risk asymmetry explains why Tennessee said yes when LA, Chicago, Baltimore, and DC all said no. The engineering gamble is wild. 12-foot diameter tunnels instead of 28-foot. Fully electric Prufrock machines that mine continuously instead of stopping every 5 feet to install lining segments. Zero people in the tunnel during operations. A machine that “porpoises” into the ground from a truck instead of requiring million-dollar launch pits and cranes. Every one of those innovations has worked in Las Vegas sand. None have been tested in karst limestone, the geology that creates sinkholes, caves, and underground streams. Their own CEO said at the unveiling that Nashville would not be their choice if they were optimizing for easiest places to tunnel. This tells you everything about what The Boring Company is actually trying to prove. Nashville is where the thesis meets the hardest possible geology. 50 inches of annual rainfall versus Vegas’s 4. Rock that creates underground caves and streams. They just signed a construction contract in Dubai too, meaning they need Nashville to work before the next project launches. The internal memo from the governor’s office estimates 1 mile per month. The Boring Company’s website claims 1 mile per week. That 4x gap between political planning and corporate marketing will determine whether this finishes in 2027 or 2030. Week 7, when Prufrock-MB2 arrives, is when this gets real. Two machines boring simultaneously through Tennessee limestone will answer the question the entire tunneling industry has been debating for a decade: whether a startup can actually outrun the physics that made infrastructure the slowest-moving sector in construction.

English
2.6K
3.7K
44.2K
34.7M
Olivia Moore
Olivia Moore@omooretweets·
Our kids are going to grow up in a world where B.C. refers to “Before Claude”
English
109
266
2.2K
107K