Al Freney

488 posts

Al Freney banner
Al Freney

Al Freney

@AlFreney

Ireland Katılım Ocak 2016
902 Takip Edilen75 Takipçiler
Al Freney retweetledi
Laoise de Brún | Barrister | Seanad Candidate
Anyone else noticing and loving the nuns and priests getting involved? Both reminiscent of another uprising 110 years ago and in tune with the global revival official Ireland is so tone deaf on. Love to see it 💪🏻👌🏻
English
87
1.7K
5.6K
91.4K
Al Freney retweetledi
Sinéad O’Sullivan
Sinéad O’Sullivan@SineadOS1·
The protests in Ireland are not about just fuel! They are about the distance between Ireland on this graph and every other modern and developed economy. Ireland is second wealthiest but gets waaaaay less than any other country for that wealth. By a golden mile. That visual gap in this graph? That’s what people are protesting. It’s a lack of infrastructure and the everyday enshittification of services, the economy, and the additional difficulty of trying to live, relative to peers in any other country. It also highlights why people don’t get uniformly listened to! - because there is no government architecture to engage meaningfully across this huge gap. That gap is a three hour drive to work in traffic, a 14 month wait for an MRI, buses that don’t arrive, trains that don’t exist, schools that have no places for your kids, houses that are unaffordable, pubs that close before midnight, €12 sandwiches, expensive fuel. People feel this gap, even if they can’t explain it precisely. And that builds into resentment, and ultimately protest. Fuel just happened to be the next thing that could be pointed to, today.
Sinéad O’Sullivan tweet media
English
288
1.5K
5.9K
452K
Al Freney
Al Freney@AlFreney·
@MartianSeervant @EndTheEU @SuzieD755164 Decentralised Finance, a crypto term to describe permissionless banking on a crypto network. Basically a crypto wallet you own and control to interact with other crypto services. Problem is to load the crypto wallet you use traditional banking services...
English
2
0
1
27
Susanne Delaney
Susanne Delaney@SuzieD755164·
This digital ID is "legally mandated" by the EU. By the end of the year, all banking institutions, etc, won't be letting anyone do their banking WITHOUT digital ID. LOCKSTEP. Once we are in this system, it will be almost impossible to reverse.
Susanne Delaney tweet media
Fianna Fáil@fiannafailparty

The Digital Wallet - making life easier! Major life events like moving home or a new job often mean dealing with multiple public services. The Wallet will streamline these processes, making access to supports faster, easier, and more secure. Public consultation now live!

English
118
628
1.1K
46.2K
IncomeSharks
IncomeSharks@IncomeSharks·
Rising unemployment and parabolic national debt unfortunately aren't part of an Iran peace deal. Economic data was looking more promising for a bit but now I think the market is starting to price in the potential for distress over resilience.
IncomeSharks tweet mediaIncomeSharks tweet media
English
34
11
348
28.6K
Al Freney
Al Freney@AlFreney·
@CryptoFeras With no signs of de-escalation of the war in Iran how likely are we to sustain a run ?? All the signs point to more escalation and potentially Iranian oil infrastructure going to be hit next??
English
0
0
1
36
Crypto Feras
Crypto Feras@CryptoFeras·
#Ethereum called the 3D bottom publicly. called it again. and again. it's playing out now 🎯 bold & clean. first target: $2,800 if $BTC extends — eyes on $3,393 #trading #ethusdt
Crypto Feras tweet media
Crypto Feras@CryptoFeras

#Ethereum save this tweet ✍️ 3D TF bullish divergence in the oversold zone. something that happens once every 2 years is forming right now. either from here, or after a lower low ~1770$ , $ETH is set for a solid 1000$+ reversal like, RT & save this. will get back to it 🤝 $ETHUSD #ETHUSDT

English
16
7
37
15K
Stani
Stani@StaniKulechov·
Earlier today, a user attempted to buy AAVE using $50M USDT through the Aave interface. Given the unusually large size of the single order, the Aave interface, like most trading interfaces, warned the user about extraordinary slippage and required confirmation via a checkbox. The user confirmed the warning on their mobile device and proceeded with the swap, accepting the high slippage, which ultimately resulted in receiving only 324 AAVE in return. The transaction could not be moved forward without the user explicitly accepting the risk through the confirmation checkbox. The CoW Swap routers functioned as intended, and the integration followed standard industry practices. However, while the user was able to proceed with the swap, the final outcome was clearly far from optimal. Events like this do occur in DeFi, but the scale of this transaction was significantly larger than what is typically seen in the space. We sympathize with the user and will try to make a contact with the user and we will return $600K in fees collected from the transaction. The key takeaway is that while DeFi should remain open and permissionless, allowing users to perform transactions freely, there are additional guardrails the industry can build to better protect users. Our team will be investigating ways to improve these safeguards going forward.
English
2.9K
998
11.1K
6.6M
Suburb Septembriseur
Suburb Septembriseur@primarycatdad·
Iran just has to hang on until Monday morning at 9:30 AM EST
English
79
484
21.9K
3.3M
Digital-Dealer.eth
Digital-Dealer.eth@__DigitalDealer·
@SprinterPress a $200 drone just turned a billion dollar radar into scrap metal. the US is spending $10M per tomahawk to hit targets that cost $500 to rebuild. this war is unwinnable by math alone
English
1
4
20
1.4K
Sprinter Press Agency
Sprinter Press Agency@SprinterPress·
🇮🇷 Precise hit of the Iranian Shahed 136 drone on the American radar in Bahrain. The price of this radar is about one billion dollars.
English
24
311
1.5K
40.2K
Al Freney
Al Freney@AlFreney·
@john_mcguirk If true why has this image not being released. If the goal is for the Iranian people to rise up against the regime this would be a helpful development
English
1
0
0
13.5K
DD Geopolitics
DD Geopolitics@DD_Geopolitics·
🇮🇷 BREAKING: EXPLOSIONS IN TEHRAN, IRAN.
DD Geopolitics tweet mediaDD Geopolitics tweet media
English
22
204
1.2K
90.2K
Al Freney
Al Freney@AlFreney·
@ahfultz What are we tracking here? The wander of the geo magnetic north pole?
English
1
0
0
439
Konrad Mazowiecki
Konrad Mazowiecki@MrOizo2k22·
@wayne_m159 @__DeeeCR7 How can you drive into the field if you stopped to zero and has no more time for any action. You people really think that you can repeat this after save till you win the game?
English
9
1
9
9.2K
R!cky W.
R!cky W.@wayne_m159·
In a situation like this, what's the best possible way to avoid dying as a driver with reaction time factored in?
English
4.5K
1K
18.5K
5.8M
Al Freney
Al Freney@AlFreney·
@wayne_m159 @__DeeeCR7 Field was the only option in this situation and would have almost certainlybsaved their lives. Maybe the driver didn't understand the imminent danger and thought they would have been safe in the car ,that it could take the impact.
English
0
0
0
254
Norsemun1776
Norsemun1776@Norsemun·
@AntiLeftMemes Where were these heroes when Obama was setting records (beating Trump's numbers) over an 8 year span. Obama deported more from both the interior and border. His ICE agents killed 76 people. Now, these douchenozzles are obsessed with 2? Democrats are unserious people.
Norsemun1776 tweet media
English
1
0
2
35
Grok
Grok@grok·
The post references a recent release of Epstein files revealing that in 2018, Jeffrey Epstein purchased 330 gallons of sulfuric acid via LSJE LLC for his private island. Sulfuric acid has industrial uses like water treatment or cleaning, but the purchase has sparked speculation about potential misuse given Epstein's history. No confirmed purpose is stated in the documents.
English
1
0
0
301
Clown World ™ 🤡
Clown World ™ 🤡@ClownWorld·
Hey @grok what exactly does someone need 330 gallons of sulfuric acid for?
Clown World ™ 🤡 tweet media
English
973
608
20.6K
8.1M