
Sopho
1.1K posts

Sopho
@FPLSopho
@fplreview Elite 1k and Analytics Elite 64 Qualifier League. 2x Top 5ks in last 4 years. Long suffering Fulham fan. EVengers SKLW.
Katılım Eylül 2023
114 Takip Edilen659 Takipçiler

@OfficialSKLW @FPL_FrodoB @FPLNick1 @fpl_phenom Happy you did this on total blanks versus percentage of goals per striker appearance
English

#SKLW 'Liam Delap' award for worst performing strikers
Banyana Bafana's striker @FPL_FrodoB 🥇blanked more often than he scored & failed to gel with new No.10 @FPLHaveABeer who struggled in his first season
It was a similar story for El Sin Nombre's @FPLNick1 & @fpl_phenom

English

Very happy with the below, particularly given I ceded ~5EV in GW36-37 for ++risk.
+78 on Bullet Wisdom per @SolioAnalytics.
105th globally under EV (mins) and 6th in the AE1k for minutes per @fplreview.
Captaincy killed my rank.
Probably not enough for AE64, we’ll see.
#FPL



English

GW38 - 64 and a green from 50k->39k.
A good year for me, sadly all of the creative risks I took GW30-38 didn’t pay off and hence wasn’t the great year it could have been with small margins like 2x TC fails but we go again.
Analytics dominating #FPL *again*, well done all.

English

@FplStatsdan Grim but knew what I was signing up for, the outcome demonstrates I set myself up well for my objective
English

GW37 - 43 and a monster red from 25k to 50k.
On the pitch, *everything* went wrong bar a Michael Keane assist.
I have no complaints seeing as I consciously made a risk based team very capable of halving/doubling rank to chase a Top 10k.
1FT for 38, we wait for City info. #FPL

English

@FPL_Stormz For my team specifically? Let’s see what happens with the Man City team and what I can do with my 1x FT as a result. As it stands would feel confident given the differentials I have I could clear 20+ in any GW (but also as shown this GW can go the other way)!
English

Into GW37, my aim was to have a team with good EV that could easily get 30 points of luck in 2 GWs.
I achieved that outcome for GW37 (15), sadly it went the wrong way.
Fine margins with DCL 96” goal/Saka DEFCON vs Ndiaye spurning 2on1/Thiago sitter. Thats football and #FPL.


Sopho@FPLSopho
My approach to GW37: I am 24 pts off the Top 10k, and so with safety lag need ~30 points of positive variance to reach my goal. Keane, Ndiaye and Palmer are all great EV with sub 10% EO and so will keep all. I will start Verbruggen and Van Hecke and bench DCL for COVAR (1/6)
English

GW37 - Senesi + J Pedro -> Gabriel + Thiago (2/2FTs), with Ndiaye C and DCL benched.
Thoughts on both of these calls in the thread below. I bought Thiago over any of the <10% EO MIDs because I just prefer the line (maybe Bowen next week) and EV.
#FPL
x.com/fplsopho/statu…

Sopho@FPLSopho
My approach to GW37: I am 24 pts off the Top 10k, and so with safety lag need ~30 points of positive variance to reach my goal. Keane, Ndiaye and Palmer are all great EV with sub 10% EO and so will keep all. I will start Verbruggen and Van Hecke and bench DCL for COVAR (1/6)
English

@TheFPLArmband Not for me personally. If going for a player that EO I would rather grab more EV (eg Bruno)
English

@FPLSopho Good thread. Any love for H captaincy, or EO simply too high?
English

Captaincy is tough. I’m happy to swerve Saka, particularly given concerns over his training..
Bruno and Gabriel have best EV in my team and likely to both be good options with sub 130% EO.
I am however tempted to go for Ndiaye or the MID I buy given sub 10% EO.
#FPL
(5/5)
English








