

not-ecopaw.bsky.social
230 posts

@Not_EcoPaw
https://t.co/94cOWrOLei





Today three sections of the Beijing Subway opened. Line 3 Phase 1, Line 12 Phase 1 and the final section of the Changping Line. The Beijing Subway is over 815km long. Maps by MetroMan地铁通.




The line will use driverless 4-car Type A trains with platforms long enough for 8A (two 4A trains coupled). Due to the larger trains, the reserved platform (for 6B) at Dongshi Shitiao won't be used. Instead, new platforms for Line 3 would be built under it. (11/14)



FrontRunner station platforms now feature gap fillers, making boarding safer and smoother at any door. Learn more about this enhancement and other accessibility options at: rideuta.com/accessibility. #WeMoveYou