@Arusharma__ @Abhi1shrma @dcsambaoffice Power supply to Vijaypur is fed from 132/33 kV Grid Station Bari Brahamana-I, which has expienced a major technical snag from 4pm to 8pm.. Though the 33 kV power to Vijaypur Receiving Station has been restored but due to spike in load, rotational curtailment is being enforced
English
0
0
0
27
Aru Sharma
Aru Sharma@Arusharma__·
@Abhi1shrma @dcsambaoffice Sir, there is no electricity in Vijaypur from the last 7 Hours. Please look into this and do the needful. This is not the first time from the last few days there is scheduled and unscheduled Power cuts in our area. 🙏🙏
English
2
0
1
53
Executive Engineer STD-II Jammu
Due to some Technical snag in 5 MVA, 66/11 kV power transformer , power affected at R/stn Rehyian (Samba).. Restoration work is underprogress ..
English
0
1
0
0
Executive Engineer STD-II Jammu
Due to some technical snag in 10 MVA transformer at 2x10 MVA Sidhra R/Stn. Power to Tawi Vihar and adjoining areas is affected.. The load is being shifted on standby 10 MVA transformer Restoration is expected by 11 pm
English
0
0
1
0
Executive Engineer STD-II Jammu
An emergency shutdown of 33 kv lines (feeding Gandhi Nagar, Nanaknagar,Shastri Nagar and part of Trikuta Nagar areas) was taken for urge repairs.. power shall being restored shortly.. inconvenience caused to the public is highly regretted
English
0
0
2
0
Executive Engineer STD-II Jammu
@ChairmanJPDCL @SEJAMMU_JPDCL 33 kV Line feeding Khana Chak is under fault due to some insulator failure problem which is being identified by the staff since early morning and shall be restored soon. Inconvenience caused on this account is highly regretted
English
0
0
0
0
Executive Engineer STD-II Jammu
Due to oversight, affected areas have been wrongly mentioned in the notification.. Areas affected due to shutdown down of 33 kV G6 Line are: Channi Himmat, Chowadi and part of Bathandi area fed from 3x10 MVA Channi Himmat Receiving Stn.. Inconvenience caused is regretted.
Executive Engineer STD-II Jammu tweet media
English
0
0
0
0
Executive Engineer STD-II Jammu
10 MVA 33/11KV power transformer secessfully charged at Raya R/Stn. as existing 8 MVA transformer got damaged on 8th Jan 22 and temporarily power was restored with a standby 5 MVA transformer resulting in heavy curtailment in the area @ShivAnantTayal @JPDCLofficial